INTERNAL TASK NOTE

Updated report on design and costing of apparatus

19/12/2008 -Task : TASK 10
Author(s) :R.D. Page et al.

Updated report on design and costing of apparatus
Low-energy Beta Beams

15/12/2008 -Task : TASK 10
Author(s) :C. Volpe and R. Lazauskas

Physics motivation and conceptual design for low-energy beta beams at EURISOL
In-beam validations

31/10/2008 -Task : TASK 10
Author(s) :R.D. Page et al.

In-beam validations of design concepts and simulation tools for experimental programmes at the EURISOL facility
Preliminary design and costing of apparatus

31/01/2008 -Task : TASK 10
Author(s) :R.D. Page et al.

Preliminary design and costing of apparatus
Selection of key experiments with the associated instrumentation

21/02/2007 -Task : TASK 10
Author(s) :R.D. Page et al.

Selection of key experiments with the associated instrumentation
Apparatus specification for key experiments

21/02/2007 -Task : TASK 10
Author(s) :R.D. Page et al.

Apparatus specification for key experiments
Experimental Requirements - Beam and Machine Characteristics

21/02/2007 -Task : TASK 10
Author(s) :Nigel Orr

Experimental Requirements - Beam and Machine Characteristics
Physics and Instrumentation Subtasks and Leaders

05/02/2007 -Task : TASK 10
Author(s) :R.D. Page

Physics and Instrumentation Subtasks and Leaders
Task 1 Management
Task 2 Multi-MW Target Station
Task 3 Direct Target
Task 4 Fission Target
Task 5 Safety & Radioprotection
Task 6 Heavy Ion Accelerator Design
Task 7 Proton Accelerator Design
Task 8 SC Cavity Development
Task 9 Beam Preparation
Task 10 Physics and Instrumentation
Task 11 Beam Intensity Calculations
Task 12 Beta-Beam Aspects