ANNUAL REPORTS

ANNUAL REPORTS

TASK 1   -
EURISOL DS FINAL REPORT

11/12/2009 -Task : TASK 1
Author(s) :The EURISOL Management Board, Edited by J.C.Cornell

This is a browser-friendly PDF version of the Final Report of the EURISOL Design Study. 13 MBytes.
TASK 1   -
Task 11 - Detailed version of Final Report

23/11/2009 -Task : TASK 1
Author(s) :Aleksandra Kelic et al.

Additional material relating to the Final Report
TASK 1   -
Task 10 - Detailed version of Final Report

23/11/2009 -Task : TASK 1
Author(s) :Robert Page et al.

Additional material relating to the Final Report
TASK 1   -
Task 9 - Detailed version of Final Report

23/11/2009 -Task : TASK 1
Author(s) :Ari Jokinen et al.

Additional material relating to the Final Report
TASK 1   -
Task 7 - Detailed version of Final Report

23/11/2009 -Task : TASK 1
Author(s) :Alberto Facco et al.

Additional material relating to the Final Report
TASK 1   -
Task 6 - Detailed version of Final Report

23/11/2009 -Task : TASK 1
Author(s) :Marie-Hélène Moscatello et al.

Additional material relating to the Final Report
TASK 1   -
Task 5 - Detailed version of Final Report

23/11/2009 -Task : TASK 1
Author(s) :Jean-Christophe David et al.

Additional material relating to the Final Report
TASK 1   -
Task 2 - Detailed version of Final Report - PART 2

23/11/2009 -Task : TASK 1
Author(s) :Yacine Kadi et al.

Additional material relating to the Final Report. Part 1 + Part 2 = 24 Mbytes
TASK 1   -
Task 2 - Detailed version of Final Report - PART 1

23/11/2009 -Task : TASK 1
Author(s) :Yacine Kadi et al

Additional material relating to the Final Report
TASK 1   -
Task 4 Detailed Final Report

23/11/2009 -Task : TASK 1
Author(s) :Luigi Tecchio et al.

Additional material
TASK 1   -
EURISOL DS FIFTH PERIODIC REPORT

20/11/2009 -Task : TASK 1
Author(s) :.

.
TASK 1   -
DELIVERABLE TASK 10 - M4 UPDATED DESIGN AND COSTING OF APPARATUS

28/04/2009 -Task : TASK 1
Author(s) :--

--
TASK 1   -
DELIVERABLE TASK6 - D2 DEVELOPMENT OF NORMAL RFQ STRUCTURE

28/04/2009 -Task : TASK 1
Author(s) :--

--
TASK 1   -
DELIVERABLE TASK6 - D1 BEAM DYNAMICS CALCULATION

28/04/2009 -Task : TASK 1
Author(s) :--

--
TASK 1   -
DELIVERABLE TASK5 - D2 RADIOACTIVITY CONTROL, SAFETY AND RISK

28/04/2009 -Task : TASK 1
Author(s) :--

--
TASK 1   -
DELIVERABLE TASK2 - D3 ENGINEERING DESIGN CONSTRUCTION OF FUNCTIONAL HG LOOP

28/04/2009 -Task : TASK 1
Author(s) :--

--
TASK 1   -
DELIVERABLE TASK1 - D3 REPORT ON SITE OPTION

28/04/2009 -Task : TASK 1
Author(s) :--

--
TASK 1   -
FOURTH ANNUAL REPORT - PERIOD FROM 1/2/2008 TO 31/1/2009

28/04/2009 -Task : TASK 1
Author(s) :--

--
TASK 1   -
EURISOL DS THIRD ANNUAL REPORT

24/04/2008 -Task : TASK 1
Author(s) :The EURISOL Management Board

EURISOL Design Study Third Annual Report 01/02/2007-31/01/2008
TASK 1   -
DELIVERABLE TASK 11 D1 Heavy Ion requirement for driver accelerator

11/01/2008 -Task : TASK 1
Author(s) :K.-H. Schmidt, A. Kelic, S. Lukic, M. V. Ricciardi, M. Veselsky

Possibilities are studied for the optimization of EURISOL rare nuclide yields in specific regions of the nuclear chart by building the driver accelerator in a way that enables accelerating several additional beam species, to specific energies, besides the baseline 1 GeV proton beam. Nuclide production rates with these driver beams are compared to the production rates expected with the 1 GeV proton beam in the direct-production and the high-power-converter scenarios. Arguments are presented to show that several additional driver-beam scenarios could provide substantial benefit for the production of nuclides in specific regions of the nuclear chart....
TASK 1   -
DELIVERABLE TASK 10 - M2.1 Apparatus specification for key experiments

11/01/2008 -Task : TASK 1
Author(s) :TASK 10

EUROPEAN ISOTOPE SEPARATION ON-LINE RADIOACTIVE ION BEAM FACILITY
TASK 1   -
DELIVERABLE TASK 10 - M1.2 Selection of key experiments with the associated instrumentation

11/01/2008 -Task : TASK 1
Author(s) :TASK 10

Proton-rich N = Z isotopes in the vicinity of 100Sn will be used to determine the super-allowed beta decay ft value and to determine the vector coupling constant gv of the weak interaction. The measurements with high-Z isotopes are crucial to test the nuclear- structure dependent corrections needed to etermine gv and to determine with improve accuracy the Vud matrix element of the Cabbibo-Kobayashi-Maskawa quark mixing matrix. 
TASK 1   -
DELIVERABLE TASK 9 - D6 Preliminary breeding research and development

11/01/2008 -Task : TASK 1
Author(s) :Pierre Delahaye, Oliver Kester, Thierry Lamy, Fredrik Wenander, Holger Zimmermann

EUROPEAN ISOTOPE SEPARATION ON-LINE RADIOACTIVE ION BEAM FACILITY
TASK 1   -
DELIVERABLE TASK6 M3 Normal Conducting RFQ-intermediate report

11/01/2008 -Task : TASK 1
Author(s) :Alexander Bechtold

EUROPEAN ISOTOPE SEPARATION ON-LINE RADIOACTIVE ION BEAM FACILITY
TASK 1   -
DELIVERABLE TASK 6 - M6.1 Design preparation of high frequency chopper

11/01/2008 -Task : TASK 1
Author(s) :M.Di Giacomo, G.Le Dem

EUROPEAN ISOTOPE SEPARATION ON-LINE RADIOACTIVE ION BEAM FACILITY
TASK 1   -
DELIVERABLE TASK 6 - M2.1 Beam Dynamics:preliminary design

11/01/2008 -Task : TASK 1
Author(s) :Jean-Luc Biarrotte, Patrick Bertrand

EUROPEAN ISOTOPE SEPARATION ON-LINE RADIOACTIVE ION BEAM FACILITY
TASK 1   -
DELIVERABLE: TASK 6 - M1.2 EXPERIMENTAL REQUIREMENTS – BEAM AND MACHINE CHARACTERISTICS

11/01/2008 -Task : TASK 1
Author(s) :-

-
TASK 1   -
DELIVERABLE: TASK 4 - D2-M2.1 Preliminary Design of Vacuum System for the Fission Target

11/01/2008 -Task : TASK 1
Author(s) :O. Alyakrinskiy, M. Barbui, Luigi B. Tecchio, M. Tonezzer

EUROPEAN ISOTOPE SEPARATION ON-LINE RADIOACTIVE ION BEAM FACILITY
TASK 1   -
EURISOL DS SECOND ANNUAL REPORT

09/11/2007 -Task : TASK 1
Author(s) :The EURISOL Management Board

EURISOL Design Study Second Annual Report 01/02/2006-31/01/2007
TASK 1   -
DELIVERABLE: TASK 9 - D1-M1 Definition of reference design

26/05/2006 -Task : TASK 1
Author(s) :---

---
TASK 1   -
DELIVERABLE: TASK 4 D1-M1 Neutronic calculations report

26/05/2006 -Task : TASK 1
Author(s) :---

---
TASK 1   -
DELIVERABLE: TASK 1 - D1-M1 WEB SITE SET UP

26/05/2006 -Task : TASK 1
Author(s) :---

---
TASK 1   -
FIRST ANNUAL REPORT - PERIOD FROM 1/2/2005 TO 31/1/2006

26/05/2006 -Task : TASK 1
Author(s) :Edited by: Rosella Battistella

---

INTERIM ANNUAL REPORTS

TASK 1   -
Fourth Interim Annual Report

26/11/2008 -Task : TASK 1
Author(s) :Y. Blumenfeld and J. Cornell

Fourth Interim Annual report covering the period from 1/2/2008 to 31/10/2008
TASK 1   -
Third Interim Annual Report

23/11/2007 -Task : TASK 1
Author(s) :Yorick BLUMENFELD

From 1st February 2007 to 31st October 2007
TASK 1   -
Second Interim Annual Report

05/12/2006 -Task : TASK 1
Author(s) :Yorick Blumenfeld and Celine Hovaguimian

Second Interim Annual Report from February 1st 2006 to October 31st 2006
TASK 1   -
FIRST INTERIM ANNUAL REPORT PERIOD FROM 1/2/2005 TO 31/10/2005

26/05/2006 -Task : TASK 1
Author(s) :Edited by: Rosella Battistella

---

PLANNIG GUIDELINES

TASK 1   -
Fifth Planning guidelines

26/11/2008 -Task : TASK 1
Author(s) :Y. Blumenfeld and J. Cornell

Planning Guidelines for the period 01/02/2009 to 31/07/2009
TASK 1   -
Four Year Planning Guidelines

23/11/2007 -Task : TASK 1
Author(s) :Yorick BLUMENFELD

From 1st February 2008 to 31st January 2009
TASK 1   -
Third Year Planning Guidelines

05/12/2006 -Task : TASK 1
Author(s) :Yorick Blumenfeld and Celine Hovaguimian

Third Year Planning Guidelines from February 1st 2007 to January 31st 2008
TASK 1   -
SECOND YEAR PLANNING GUIDELINES PERIOD FROM 1/2/2006 TO 31/1/2007

26/05/2006 -Task : TASK 1
Author(s) :Edited by: Rosella Battistella

---

FOUR MONTH REPORTS

TASK 1   -
SECOND YEAR - FOUR MONTH REPORT

08/11/2006 -Task : TASK 1
Author(s) :Edited by: Rosella Battistella

--