Publications: Internal Task note

CODE EXPLANATION:
AA-BB-CCCC-DDDD

AA = TASK NUMBER

BB = TYPE OF THE DOCUMENT:

21 = JOURNAL ARTICLE
22 = ABSTRACT
23 = PROCEEDING
25 = INTERNAL TASK NOTE
27 = USEFUL DOCUMENTS
28 = CONSORTIUM AGREEMENT
29 = FINANCIAL DOCUMENTS
30 = CONTRACT
31 = ANNUAL REPORTS
32 = INTERIM ANNUAL REPORTS
33 = PLANNIG GUIDELINES
34 = FOUR MONTH REPORTS

CCCC = YEAR

DDDD = DOCUMENT NUMBER

EURISOL High Power Oxide Target Tests at TRIUMF

10/08/2007 -Task : TASK 3
Author(s) :E. Bouquerel, L. Bruno, J. Lettry, E. Noah, L. Penescu1, T. Stora, R. Wilfinger

Project proposal to test an oxide target at high power at TRIUMF
Engineering aspects for the EURISOL 100kW liquid metal targets

10/08/2007 -Task : TASK 3
Author(s) :E. Noah

Technical note to identify the constraints, requirements and assumptions for the design of the 100kW liquid metal targets.
Feasibility study for the 100kW direct targets

23/10/2006 -Task : TASK 3
Author(s) :T. Stora, J. Lettry, R. Catherall, E. Noah, R. Wilfinger, L. Penescu, E. Bouquerel, S. Fernandes, M. Santana-Leitner, L. Zanini, I. Guenter, F. Groeschel

Tools and developments required to go from today's operating standards to the 100kW benchmark targets.
Optimization of 6He production using W or Ta converter surrounded by BeO target assembly

23/10/2006 -Task : TASK 3
Author(s) :N. Thiollieres, J.C. David, V. Blideanu, D. Dore, B. Rapp, D. Ridikas

Optimization of the converter-BeO 2 step target for 6He production done on MCNPX. x5 gain factor is obtained for a final production of 1.1e14 6He/s with an incident 200kW, 2 GeV proton beam. Temperature profiles and BeO release properties are yet to be determined.
W converter - BeO dual target prototype for 6He production - a preliminary note

23/10/2006 -Task : TASK 3
Author(s) :T. Stora, E. Bouquerel, J. Lettry

Preliminary design of a solid converter that accomodates the heat load from a 100kW 1 GeV proton beam. Base for studies by numerical simulations of heat deposition, heat transfer and neutronics for subsequent design iterations.
Baseline parameters 05/2005

23/02/2006 -Task : TASK 3
Author(s) :T. Stora for the Task workgroup

List of useful parameters and range of variation.
radioprotection calculations

22/02/2006 -Task : TASK 3
Author(s) :L. Zanini

Safety report for submission to the Swiss authorities BAG for irradiation program of target materials at PSI-LISOR
Publications from 11 to 17 of 17