Publications: Internal Task note
D6 - Cryomodule assembly and cryogenic test
08/10/2009 -Task : TASK 8
Author(s) :S. Bousson, G. Olry, P. Duthil, C. Joly, J. Lesrel, F. Chatelet, P. Szott, CNRS/IN2P3/IPN Orsay (France).
This document reports on the assembly and cryogenic test of the spoke cryomodule.
This document reports on the assembly and cryogenic test of the spoke cryomodule.
Download
08-25-2009-0019 ( 1512KB )
D7 - Final report on cryomodule cold test
08/10/2009 -Task : TASK 8
Author(s) :S. Bousson, G. Olry, P. Duthil, C. Joly, J. Lesrel, F. Chatelet, P. Szott, CNRS/IN2P3/IPN Orsay (France).
This document is the final report on the spoke cryomodule test
This document is the final report on the spoke cryomodule test
Download
08-25-2009-0018 ( 731KB )
D1 - Cryostat design and fabrication
08/10/2009 -Task : TASK 8
Author(s) :S. Bousson, G. Olry, F. Chatelet, P. Duthil, D. Grolet, F. Lutton, R. Martret, G. Michel, H. Saugnac, P. Szott, CNRS/IN2P3/IPN Orsay (France).
This document reports on the spoke cryostat design and fabrication
This document reports on the spoke cryostat design and fabrication
Download
08-25-2009-0017 ( 2570KB )
D5 - Spoke cavity cold test
08/10/2009 -Task : TASK 8
Author(s) :S. Bousson, G. Olry, P. Duthil, C. Joly, J. Lesrel, F. Chatelet, P. Szott, CNRS/IN2P3/IPN Orsay (France).
Thie document reports on the spoke cavities tests at cryogenic temperature.
Thie document reports on the spoke cavities tests at cryogenic temperature.
Download
08-25-2009-0016 ( 788KB )
Coupler conditioning bench
08/10/2009 -Task : TASK 8
Author(s) :E. Rampnoux, S. Bousson, G. Olry, P. Duthil, C. Joly, J. Lesrel, CNRS/IN2P3/IPN Orsay (France).
A. Facco, F. Scarpa, INFN-Laboratori Nazionali di Legnaro, Padova, (Italy).
This document reports on the design of the coupler conditioning bench
This document reports on the design of the coupler conditioning bench
Download
08-25-2009-0015 ( 1188KB )
D5 - Power coupler conditioning bench
08/10/2009 -Task : TASK 8
Author(s) :E. Rampnoux, S. Bousson, G. Olry, P. Duthil, C. Joly, J. Lesrel, CNRS/IN2P3/IPN Orsay (France).
A. Facco, F. Scarpa, INFN-Laboratori Nazionali di Legnaro, Padova, (Italy).
This documents reports on the design of the power coupler conditioning bench.
This documents reports on the design of the power coupler conditioning bench.
Download
08-25-2009-0014 ( 1188KB )
D4 - Half Wave Resonators developments
08/10/2009 -Task : TASK 8
Author(s) :A. Facco, F. Scarpa, D. Zenere, INFN-Laboratori Nazionali di Legnaro, Padova, (Italy).
This document reports on the development of the half wave resonators and its associated cold tuning system
This document reports on the development of the half wave resonators and its associated cold tuning system
Download
08-25-2009-0013 ( 1038KB )
D3 - Spoke cavity developments
08/10/2009 -Task : TASK 8
Author(s) :S. Bousson, , G. Olry, JL Biarrotte, P. Duthil, C. Joly, N. Gandolfo, J. Lesrel, L. Lukovac, A. Ponton, E. Rampnoux, H. Saugnac, CNRS/IN2P3/IPN Orsay (France).
This documents reports on the development of spoke cavities, along with the coupler and cold tuning system.
This documents reports on the development of spoke cavities, along with the coupler and cold tuning system.
Download
08-25-2009-0012 ( 4789KB )
D2 - RF source Developments
08/10/2009 -Task : TASK 8
Author(s) :A. Facco, F. Scarpa, D. Zenere, INFN-Laboratori Nazionali di Legnaro, Padova, (Italy).
E. Rampnoux, C. Joly, J. Lesrel, S. Bousson, CNRS/IN2P3/IPN Orsay (France).
This document reports on the 352 MHz solid state RF sources developments
This document reports on the 352 MHz solid state RF sources developments
Download
08-25-2009-0011 ( 1112KB )
D1 - Spoke cryostat design and fabrication
08/10/2009 -Task : TASK 8
Author(s) :S. Bousson, G. Olry, F. Chatelet, P. Duthil, D. Grolet, F. Lutton, R. Martret, G. Michel, H. Saugnac, P. Szott
This document reports on the design and fabrication of the spoke cryostat.
This document reports on the design and fabrication of the spoke cryostat.
Download
08-25-2009-0010 ( 3144KB )
Publications from 1 to 10 of 19