Publications: Internal Task note

CODE EXPLANATION:
AA-BB-CCCC-DDDD

AA = TASK NUMBER

BB = TYPE OF THE DOCUMENT:

21 = JOURNAL ARTICLE
22 = ABSTRACT
23 = PROCEEDING
25 = INTERNAL TASK NOTE
27 = USEFUL DOCUMENTS
28 = CONSORTIUM AGREEMENT
29 = FINANCIAL DOCUMENTS
30 = CONTRACT
31 = ANNUAL REPORTS
32 = INTERIM ANNUAL REPORTS
33 = PLANNIG GUIDELINES
34 = FOUR MONTH REPORTS

CCCC = YEAR

DDDD = DOCUMENT NUMBER

D6 - Cryomodule assembly and cryogenic test

08/10/2009 -Task : TASK 8
Author(s) :S. Bousson, G. Olry, P. Duthil, C. Joly, J. Lesrel, F. Chatelet, P. Szott, CNRS/IN2P3/IPN Orsay (France).

This document reports on the assembly and cryogenic test of the spoke cryomodule.
D7 - Final report on cryomodule cold test

08/10/2009 -Task : TASK 8
Author(s) :S. Bousson, G. Olry, P. Duthil, C. Joly, J. Lesrel, F. Chatelet, P. Szott, CNRS/IN2P3/IPN Orsay (France).

This document is the final report on the spoke cryomodule test
D1 - Cryostat design and fabrication

08/10/2009 -Task : TASK 8
Author(s) :S. Bousson, G. Olry, F. Chatelet, P. Duthil, D. Grolet, F. Lutton, R. Martret, G. Michel, H. Saugnac, P. Szott, CNRS/IN2P3/IPN Orsay (France).

This document reports on the spoke cryostat design and fabrication
D5 - Spoke cavity cold test

08/10/2009 -Task : TASK 8
Author(s) :S. Bousson, G. Olry, P. Duthil, C. Joly, J. Lesrel, F. Chatelet, P. Szott, CNRS/IN2P3/IPN Orsay (France).

Thie document reports on the spoke cavities tests at cryogenic temperature.
Coupler conditioning bench

08/10/2009 -Task : TASK 8
Author(s) :E. Rampnoux, S. Bousson, G. Olry, P. Duthil, C. Joly, J. Lesrel, CNRS/IN2P3/IPN Orsay (France). A. Facco, F. Scarpa, INFN-Laboratori Nazionali di Legnaro, Padova, (Italy).

This document reports on the design of the coupler conditioning bench
D5 - Power coupler conditioning bench

08/10/2009 -Task : TASK 8
Author(s) :E. Rampnoux, S. Bousson, G. Olry, P. Duthil, C. Joly, J. Lesrel, CNRS/IN2P3/IPN Orsay (France). A. Facco, F. Scarpa, INFN-Laboratori Nazionali di Legnaro, Padova, (Italy).

This documents reports on the design of the power coupler conditioning bench.
D4 - Half Wave Resonators developments

08/10/2009 -Task : TASK 8
Author(s) :A. Facco, F. Scarpa, D. Zenere, INFN-Laboratori Nazionali di Legnaro, Padova, (Italy).

This document reports on the development of the half wave resonators and its associated cold tuning system
D3 - Spoke cavity developments

08/10/2009 -Task : TASK 8
Author(s) :S. Bousson, , G. Olry, JL Biarrotte, P. Duthil, C. Joly, N. Gandolfo, J. Lesrel, L. Lukovac, A. Ponton, E. Rampnoux, H. Saugnac, CNRS/IN2P3/IPN Orsay (France).

This documents reports on the development of spoke cavities, along with the coupler and cold tuning system.
D2 - RF source Developments

08/10/2009 -Task : TASK 8
Author(s) :A. Facco, F. Scarpa, D. Zenere, INFN-Laboratori Nazionali di Legnaro, Padova, (Italy). E. Rampnoux, C. Joly, J. Lesrel, S. Bousson, CNRS/IN2P3/IPN Orsay (France).

This document reports on the 352 MHz solid state RF sources developments
D1 - Spoke cryostat design and fabrication

08/10/2009 -Task : TASK 8
Author(s) :S. Bousson, G. Olry, F. Chatelet, P. Duthil, D. Grolet, F. Lutton, R. Martret, G. Michel, H. Saugnac, P. Szott

This document reports on the design and fabrication of the spoke cryostat.
Publications from 1 to 10 of 19