LAY-OUT OF THE EURISOL POSTACCELERATOR
30/07/2009 -Task : TASK 5
Author(s) :D. Ene, J. C. David, D. Doré, D. Ridikas
This report summarises the radiation protection studies conducted for the EURISOL post-accelerator. The goals of the work were to study the important radiological aspects of the post- accelerator layout, to make pre-conceptual designs for the most important items including the tunnel, the beam dump and experimental area, to characterize the radiation environment through over the installation and its impact on the EURISOL facility, and to identify further required analyses.
This report summarises the radiation protection studies conducted for the EURISOL post-accelerator. The goals of the work were to study the important radiological aspects of the post- accelerator layout, to make pre-conceptual designs for the most important items including the tunnel, the beam dump and experimental area, to characterize the radiation environment through over the installation and its impact on the EURISOL facility, and to identify further required analyses.
Download
05-25-2009-0036 ( 954KB )
Shielding examinations for the European Spallation Source ESS: Update for use by EURISOL
28/07/2009 -Task : TASK 5
Author(s) :Rainer Moormann
The Moyer model used in shielding design of the ESS accelerator is outlined in detail and relevant results are presented. General guidelines for shielding of a large spallation based system are presented, which take into account accidental beam losses and enhanced beam losses during start-up, too.
The Moyer model used in shielding design of the ESS accelerator is outlined in detail and relevant results are presented. General guidelines for shielding of a large spallation based system are presented, which take into account accidental beam losses and enhanced beam losses during start-up, too.
Download
05-25-2009-0035 ( 448KB )
Deliverable D3: decommissioning issues - version 2
28/07/2009 -Task : TASK 5
Author(s) :Rainer Moormann in collaboration with Task 5
Final report upon the completion of deliverable D3
Final report upon the completion of deliverable D3
Download
05-25-2009-0034 ( 9074KB )
Deliverable D1: Radiation, Activation, Dose
06/07/2009 -Task : TASK 5
Author(s) :T. Otto in collaboration with task 5
Final report upon completion of deliverable D1
Final report upon completion of deliverable D1
Download
05-25-2009-0033 ( 4025KB )
EURISOL Multi‐MW Target MAFF configuration - Radiological Protection, Radiation Safety and Shielding Aspects
03/07/2009 -Task : TASK 5
Author(s) :Y. Romanets and R. Luís
see title
see title
Download
05-25-2009-0032 ( 17407KB )
Deliverable D3: decommissioning issues
03/07/2009 -Task : TASK 5
Author(s) :Rainer Moormann in collaboration with Task 5
Final report upon completion of deliverable D3
Final report upon completion of deliverable D3
Download
05-25-2009-0031 ( 13573KB )
Estimation of Radiation Protection Shielding for a EURISOL Linear Proton Accelerator
24/06/2009 -Task : TASK 5
Author(s) :Thomas Otto, CERN
A linear accelerator for protons, based on superconducting radiofrequency technology, is envisaged as a driver accelerator for the isotope production targets in a future EURISOL facility. This note reports basic estimates of the required radiation protection shielding of such an accelerator.
A linear accelerator for protons, based on superconducting radiofrequency technology, is envisaged as a driver accelerator for the isotope production targets in a future EURISOL facility. This note reports basic estimates of the required radiation protection shielding of such an accelerator.
Download
05-25-2009-0030 ( 176KB )
Radiation protection aspects of the EURISOL Multi-MW target shielding
13/02/2009 -Task : TASK 5
Author(s) :D. Ene, J.-C. David, D. Doré, B. Rapp, D. Ridikas
This work is focused on the approach used to assess the radiological characterisation and to support waste analysis for the multi-MW power target shielding being the most challenging both in terms of technological and safety issues.
This work is focused on the approach used to assess the radiological characterisation and to support waste analysis for the multi-MW power target shielding being the most challenging both in terms of technological and safety issues.
Download
05-25-2009-0029 ( 841KB )
Screening Approach to the Activation of Soil and Contamination of Groundwater at Linear Proton Accelerator Sites
06/02/2009 -Task : TASK 5
Author(s) :Thomas OTTO, CERN
The activation of soil and the contamination of groundwater at proton accelerator sites with the radionuclides 3H and 22Na are estimated with a Monte-Carlo calculation and a conservative soil- and ground water model. The obtained radionuclide concentrations show that the underground environment of future accelerators must be adequately protected against a migration of activation products. This study is of particular importance for the proton driver accelerator in the planned EURISOL facility.
The activation of soil and the contamination of groundwater at proton accelerator sites with the radionuclides 3H and 22Na are estimated with a Monte-Carlo calculation and a conservative soil- and ground water model. The obtained radionuclide concentrations show that the underground environment of future accelerators must be adequately protected against a migration of activation products. This study is of particular importance for the proton driver accelerator in the planned EURISOL facility.
Download
05-25-2009-0028 ( 435KB )
Deliverable D2: Radioactivity control, safety and risk
01/07/2008 -Task : TASK 5
Author(s) :Compiled by P. Thirolf, LMU Munich & contributions from NIPNE Bucharest, FI Vilnius, FZ Jülich
EURISOL DS/Task5/TN-08-06 Final report upon completion of deliverable D2
EURISOL DS/Task5/TN-08-06 Final report upon completion of deliverable D2
Download
05-25-2008-0027 ( 1767KB )
Publications from 1 to 10 of 36