Publications: Internal Task note

CODE EXPLANATION:
AA-BB-CCCC-DDDD

AA = TASK NUMBER

BB = TYPE OF THE DOCUMENT:

21 = JOURNAL ARTICLE
22 = ABSTRACT
23 = PROCEEDING
25 = INTERNAL TASK NOTE
27 = USEFUL DOCUMENTS
28 = CONSORTIUM AGREEMENT
29 = FINANCIAL DOCUMENTS
30 = CONTRACT
31 = ANNUAL REPORTS
32 = INTERIM ANNUAL REPORTS
33 = PLANNIG GUIDELINES
34 = FOUR MONTH REPORTS

CCCC = YEAR

DDDD = DOCUMENT NUMBER

Updated report on design and costing of apparatus

19/12/2008 -Task : TASK 10
Author(s) :R.D. Page et al.

Updated report on design and costing of apparatus
Low-energy Beta Beams

15/12/2008 -Task : TASK 10
Author(s) :C. Volpe and R. Lazauskas

Physics motivation and conceptual design for low-energy beta beams at EURISOL
In-beam validations

31/10/2008 -Task : TASK 10
Author(s) :R.D. Page et al.

In-beam validations of design concepts and simulation tools for experimental programmes at the EURISOL facility
Preliminary design and costing of apparatus

31/01/2008 -Task : TASK 10
Author(s) :R.D. Page et al.

Preliminary design and costing of apparatus
Selection of key experiments with the associated instrumentation

21/02/2007 -Task : TASK 10
Author(s) :R.D. Page et al.

Selection of key experiments with the associated instrumentation
Apparatus specification for key experiments

21/02/2007 -Task : TASK 10
Author(s) :R.D. Page et al.

Apparatus specification for key experiments
Experimental Requirements - Beam and Machine Characteristics

21/02/2007 -Task : TASK 10
Author(s) :Nigel Orr

Experimental Requirements - Beam and Machine Characteristics
Physics and Instrumentation Subtasks and Leaders

05/02/2007 -Task : TASK 10
Author(s) :R.D. Page

Physics and Instrumentation Subtasks and Leaders
Publications from 1 to 8 of 8