Publications: Internal Task note

CODE EXPLANATION:
AA-BB-CCCC-DDDD

AA = TASK NUMBER

BB = TYPE OF THE DOCUMENT:

21 = JOURNAL ARTICLE
22 = ABSTRACT
23 = PROCEEDING
25 = INTERNAL TASK NOTE
27 = USEFUL DOCUMENTS
28 = CONSORTIUM AGREEMENT
29 = FINANCIAL DOCUMENTS
30 = CONTRACT
31 = ANNUAL REPORTS
32 = INTERIM ANNUAL REPORTS
33 = PLANNIG GUIDELINES
34 = FOUR MONTH REPORTS

CCCC = YEAR

DDDD = DOCUMENT NUMBER

EURISOL Design Study Final Report

08/12/2009 -Task : TASK 1
Author(s) :The EURISOL Management Board, Edited by J.C.Cornell

This is a browser-friendly PDF version of the Final Report of the EURISOL Design Study. 13 MBytes.
D5 - Report on Cost Estimation

09/10/2009 -Task : TASK 1
Author(s) :Management Team

Report on cost estimation of the proposed EURISOL facility
D4 - Report of Facility Layout

09/10/2009 -Task : TASK 1
Author(s) :Management Team

Report of Facility Layout, with drawings
EURISOL Site Investigation Panel Report

15/03/2009 -Task : TASK 1
Author(s) :Giacomo Cuttone (INFN-LNS), Don Geesaman (Argonne), Alex C. Mueller (IN2P3), Steve Myers (CERN) and Alan Shotter (TRIUMF/ Edinburgh; chair).

Report of the Site Investigation Panel
Fourth Interim Report

26/11/2008 -Task : TASK 1
Author(s) :Y. Blumenfeld and John Cornell

Fourth Interim Report covering the period 1/2/2008 to 31/10/2008
EURISOL MERCURY TARGET EXPERIMENT: CERN SAFETY REPORT

15/10/2008 -Task : TASK 1
Author(s) :J. Gulley (CERN SC/GS)

Report on a visit to the mercury-handling lab at IPUL. The aim was to provide recommendations to IPUL on general health and safety issues relatring to the handling of mercury, the objective being to reduce exposure to acceptable levels, so far as is reasonably practical.
Intermediate Report on the Project Web-site status

19/09/2008 -Task : TASK 1
Author(s) :R. Battistella, D. Lazzarato

.
Eurisol in Brief

11/08/2008 -Task : TASK 1
Author(s) :M. Lindroos and J. Cornell on behaf of the EURISOL DS Management Board

Brief description of the EURISOL facility
EURISOL DS- THIRD ANNUAL REPORT-

15/04/2008 -Task : TASK 1
Author(s) :Yorick Blumenfeld Sandrine Bon

Third reporting period from 01/02/2007 to 31/01/2008
The EURISOL project

17/01/2007 -Task : TASK 1
Author(s) :Mats Lindroos and EURISOL MB

Poster for PSI workshop 18-19 January 2007
Publications from 1 to 10 of 16