Publications: Internal Task note
EURISOL Design Study Final Report
08/12/2009 -Task : TASK 1
Author(s) :The EURISOL Management Board, Edited by J.C.Cornell
This is a browser-friendly PDF version of the Final Report of the EURISOL Design Study. 13 MBytes.
This is a browser-friendly PDF version of the Final Report of the EURISOL Design Study. 13 MBytes.

D5 - Report on Cost Estimation
09/10/2009 -Task : TASK 1
Author(s) :Management Team
Report on cost estimation of the proposed EURISOL facility
Report on cost estimation of the proposed EURISOL facility

D4 - Report of Facility Layout
09/10/2009 -Task : TASK 1
Author(s) :Management Team
Report of Facility Layout, with drawings
Report of Facility Layout, with drawings

EURISOL Site Investigation Panel Report
15/03/2009 -Task : TASK 1
Author(s) :Giacomo Cuttone (INFN-LNS), Don Geesaman (Argonne), Alex C. Mueller (IN2P3), Steve Myers (CERN) and Alan Shotter (TRIUMF/ Edinburgh; chair).
Report of the Site Investigation Panel
Report of the Site Investigation Panel

Fourth Interim Report
26/11/2008 -Task : TASK 1
Author(s) :Y. Blumenfeld and John Cornell
Fourth Interim Report covering the period 1/2/2008 to 31/10/2008
Fourth Interim Report covering the period 1/2/2008 to 31/10/2008

EURISOL MERCURY TARGET EXPERIMENT: CERN SAFETY REPORT
15/10/2008 -Task : TASK 1
Author(s) :J. Gulley (CERN SC/GS)
Report on a visit to the mercury-handling lab at IPUL. The aim was to provide recommendations to IPUL on general health and safety issues relatring to the handling of mercury, the objective being to reduce exposure to acceptable levels, so far as is reasonably practical.
Report on a visit to the mercury-handling lab at IPUL. The aim was to provide recommendations to IPUL on general health and safety issues relatring to the handling of mercury, the objective being to reduce exposure to acceptable levels, so far as is reasonably practical.

Intermediate Report on the Project Web-site status
19/09/2008 -Task : TASK 1
Author(s) :R. Battistella, D. Lazzarato
.
.

Eurisol in Brief
11/08/2008 -Task : TASK 1
Author(s) :M. Lindroos and J. Cornell on behaf of the EURISOL DS Management Board
Brief description of the EURISOL facility
Brief description of the EURISOL facility

EURISOL DS- THIRD ANNUAL REPORT-
15/04/2008 -Task : TASK 1
Author(s) :Yorick Blumenfeld
Sandrine Bon
Third reporting period from 01/02/2007 to 31/01/2008
Third reporting period from 01/02/2007 to 31/01/2008

The EURISOL project
17/01/2007 -Task : TASK 1
Author(s) :Mats Lindroos and EURISOL MB
Poster for PSI workshop 18-19 January 2007
Poster for PSI workshop 18-19 January 2007

Publications from 1 to 10 of 16