Publications: Internal Task note
TASK 12 -
15/12/2009 -Task : TASK 12
Conceptual Design Report for a Beta-Beam Facility (long version)
15/12/2009 -Task : TASK 12
Author(s) :A. Bechtold, M. Benedikt, F. Borgnolutti, E. Bouquerel, L. Bozyk, J. Bruer, A. Chancé, P. Delahaye, A. Fabich, S. Hancock, C. Hansen, E. Jensen, A. Källberg, M. Kirk, A. Lachaize, M. Lindroos, M. Magistris, A. Mueller, J. Payet, H. Podlech, P. Puppel, M. Silari, A. Simonsson, P. Spiller, S. Stadlmann, A. Tkatchenko, S. Trovati, V. Vlachoudis, and E. Wildner
The Beta-Beam project is a concept of large scale facility that aims at providing pure electronic neutrino and antrineutrino beams for the measurement of nu_e --> nu_µ oscillations, offering unprecedented sensitivity for detection of the Theta_13 mixing angle and CP violating phase. In the scenario presented in different publications [1-3], a Beta-Beam facility could be advantageously placed at CERN making use of the PS and SPS for accelerating the beta-decaying, neutrino-emitting beams to a Lorentz gamma of 100. Intense beams of 6He and 18Ne would be produced using the so-called “isotope-separation on line” ISOL method in a facility of the scale of EURISOL. The synergy between the two projects was pointed out in [4]. The task 12 of the EURISOL design study aimed at producing a conceptual design report for the accelerator chain of a EURISOL/CERN-baseline Beta-Beam facility. This document summarizes the achievements made during the time of the study and constitutes the final conceptual report of the beta-beam facility. References [1] B. Autin, M. Benedikt, M. Grieser, S. Hancock, H. Haseroth, A. Jansson, U. Köster, M. Lindroos, S. Russenschuck and F. Wenander, "The acceleration and storage of radioactive ions for a neutrino factory", CERN/PS 2002-078 (OP), Nufact Note 121, J. Phys. G 29 (2003) 1785-1796 and long internal CERN version, PS/OP/Note 2002-181. [2] M.Mezzetto, "Physics reach of the beta-beam", J. Phys. G: Nucl. Part. Phys. 29 (2003) 1771–1776 [3] J. Bouchez, M. Lindroos and M. Mezzetto, 5th International Workshop on Neutrino Factories and Superbeams; NuFact 03. AIP Conference Proceedings, Volume 721, pp. 37-47 (2004). [4] Letter of Intent: FP6 Design Study for a beta-beam facility , September, 2003
The Beta-Beam project is a concept of large scale facility that aims at providing pure electronic neutrino and antrineutrino beams for the measurement of nu_e --> nu_µ oscillations, offering unprecedented sensitivity for detection of the Theta_13 mixing angle and CP violating phase. In the scenario presented in different publications [1-3], a Beta-Beam facility could be advantageously placed at CERN making use of the PS and SPS for accelerating the beta-decaying, neutrino-emitting beams to a Lorentz gamma of 100. Intense beams of 6He and 18Ne would be produced using the so-called “isotope-separation on line” ISOL method in a facility of the scale of EURISOL. The synergy between the two projects was pointed out in [4]. The task 12 of the EURISOL design study aimed at producing a conceptual design report for the accelerator chain of a EURISOL/CERN-baseline Beta-Beam facility. This document summarizes the achievements made during the time of the study and constitutes the final conceptual report of the beta-beam facility. References [1] B. Autin, M. Benedikt, M. Grieser, S. Hancock, H. Haseroth, A. Jansson, U. Köster, M. Lindroos, S. Russenschuck and F. Wenander, "The acceleration and storage of radioactive ions for a neutrino factory", CERN/PS 2002-078 (OP), Nufact Note 121, J. Phys. G 29 (2003) 1785-1796 and long internal CERN version, PS/OP/Note 2002-181. [2] M.Mezzetto, "Physics reach of the beta-beam", J. Phys. G: Nucl. Part. Phys. 29 (2003) 1771–1776 [3] J. Bouchez, M. Lindroos and M. Mezzetto, 5th International Workshop on Neutrino Factories and Superbeams; NuFact 03. AIP Conference Proceedings, Volume 721, pp. 37-47 (2004). [4] Letter of Intent: FP6 Design Study for a beta-beam facility , September, 2003
Download
12-25-2009-0021 ( 4585KB )
TASK 1 -
08/12/2009 -Task : TASK 1
EURISOL Design Study Final Report
08/12/2009 -Task : TASK 1
Author(s) :The EURISOL Management Board, Edited by J.C.Cornell
This is a browser-friendly PDF version of the Final Report of the EURISOL Design Study. 13 MBytes.
This is a browser-friendly PDF version of the Final Report of the EURISOL Design Study. 13 MBytes.
Download
01-25-2009-0016 ( 13192KB )
TASK 1 -
09/10/2009 -Task : TASK 1
D5 - Report on Cost Estimation
09/10/2009 -Task : TASK 1
Author(s) :Management Team
Report on cost estimation of the proposed EURISOL facility
Report on cost estimation of the proposed EURISOL facility
Download
01-25-2009-0015 ( 91KB )
TASK 1 -
09/10/2009 -Task : TASK 1
D4 - Report of Facility Layout
09/10/2009 -Task : TASK 1
Author(s) :Management Team
Report of Facility Layout, with drawings
Report of Facility Layout, with drawings
Download
01-25-2009-0014 ( 944KB )
TASK 8 -
08/10/2009 -Task : TASK 8
D6 - Cryomodule assembly and cryogenic test
08/10/2009 -Task : TASK 8
Author(s) :S. Bousson, G. Olry, P. Duthil, C. Joly, J. Lesrel, F. Chatelet, P. Szott, CNRS/IN2P3/IPN Orsay (France).
This document reports on the assembly and cryogenic test of the spoke cryomodule.
This document reports on the assembly and cryogenic test of the spoke cryomodule.
Download
08-25-2009-0019 ( 1512KB )
TASK 8 -
08/10/2009 -Task : TASK 8
D7 - Final report on cryomodule cold test
08/10/2009 -Task : TASK 8
Author(s) :S. Bousson, G. Olry, P. Duthil, C. Joly, J. Lesrel, F. Chatelet, P. Szott, CNRS/IN2P3/IPN Orsay (France).
This document is the final report on the spoke cryomodule test
This document is the final report on the spoke cryomodule test
Download
08-25-2009-0018 ( 731KB )
TASK 8 -
08/10/2009 -Task : TASK 8
D1 - Cryostat design and fabrication
08/10/2009 -Task : TASK 8
Author(s) :S. Bousson, G. Olry, F. Chatelet, P. Duthil, D. Grolet, F. Lutton, R. Martret, G. Michel, H. Saugnac, P. Szott, CNRS/IN2P3/IPN Orsay (France).
This document reports on the spoke cryostat design and fabrication
This document reports on the spoke cryostat design and fabrication
Download
08-25-2009-0017 ( 2570KB )
TASK 8 -
08/10/2009 -Task : TASK 8
D5 - Spoke cavity cold test
08/10/2009 -Task : TASK 8
Author(s) :S. Bousson, G. Olry, P. Duthil, C. Joly, J. Lesrel, F. Chatelet, P. Szott, CNRS/IN2P3/IPN Orsay (France).
Thie document reports on the spoke cavities tests at cryogenic temperature.
Thie document reports on the spoke cavities tests at cryogenic temperature.
Download
08-25-2009-0016 ( 788KB )
TASK 8 -
08/10/2009 -Task : TASK 8
Coupler conditioning bench
08/10/2009 -Task : TASK 8
Author(s) :E. Rampnoux, S. Bousson, G. Olry, P. Duthil, C. Joly, J. Lesrel, CNRS/IN2P3/IPN Orsay (France).
A. Facco, F. Scarpa, INFN-Laboratori Nazionali di Legnaro, Padova, (Italy).
This document reports on the design of the coupler conditioning bench
This document reports on the design of the coupler conditioning bench
Download
08-25-2009-0015 ( 1188KB )
TASK 8 -
08/10/2009 -Task : TASK 8
D5 - Power coupler conditioning bench
08/10/2009 -Task : TASK 8
Author(s) :E. Rampnoux, S. Bousson, G. Olry, P. Duthil, C. Joly, J. Lesrel, CNRS/IN2P3/IPN Orsay (France).
A. Facco, F. Scarpa, INFN-Laboratori Nazionali di Legnaro, Padova, (Italy).
This documents reports on the design of the power coupler conditioning bench.
This documents reports on the design of the power coupler conditioning bench.
Download
08-25-2009-0014 ( 1188KB )
Publications from 1 to 10 of 275