Fully exploiting the scientific opportunities afforded by EURISOL will demand new experimental methods and novel detector technologies. Identifying and critically evaluating these for a range of experiments will be crucial for the design of EURISOL.
Liverpool Link about Task 10
Liverpool Link about Task 10
TASK HOME
INTERNAL TASK NOTE
Updated report on design and costing of apparatus
19/12/2008 -Task : TASK 10
19/12/2008 -Task : TASK 10
Author(s) :R.D. Page et al.
Updated report on design and costing of apparatus
Updated report on design and costing of apparatus
|
Download
[ 10-25-2008-0008]
( 140KB )
Low-energy Beta Beams
15/12/2008 -Task : TASK 10
15/12/2008 -Task : TASK 10
Author(s) :C. Volpe and R. Lazauskas
Physics motivation and conceptual design for low-energy beta beams at EURISOL
Physics motivation and conceptual design for low-energy beta beams at EURISOL
|
Download
[ 10-25-2008-0007]
( 173KB )
In-beam validations
31/10/2008 -Task : TASK 10
31/10/2008 -Task : TASK 10
Author(s) :R.D. Page et al.
In-beam validations of design concepts and simulation tools for experimental programmes at the EURISOL facility
In-beam validations of design concepts and simulation tools for experimental programmes at the EURISOL facility
|
Download
[ 10-25-2008-0006]
( 2308KB )
Preliminary design and costing of apparatus
31/01/2008 -Task : TASK 10
31/01/2008 -Task : TASK 10
Author(s) :R.D. Page et al.
Preliminary design and costing of apparatus
Preliminary design and costing of apparatus
|
Download
[ 10-25-2008-0005]
( 313KB )
Selection of key experiments with the associated instrumentation
21/02/2007 -Task : TASK 10
21/02/2007 -Task : TASK 10
Author(s) :R.D. Page et al.
Selection of key experiments with the associated instrumentation
Selection of key experiments with the associated instrumentation
|
Download
[ 10-25-2007-0003]
( 357KB )
DELIVERABLES
D1 Report on keys experiments selected
No | Milestones and expected results of this task | Months due | Months achieved | Related documents |
D1 /M1.1 | Working group set up | 2 | 7 | 10-25-2007-0000 |
D1 /M1.2 | Selection of keys experiments with the associated instrumentation (workshop at ETC) | 12 | 15 | 10-25-2007-0000 |
D2 Preliminary design report of apparatus
No | Milestones and expected results of this task | Months due | Months achieved | Related documents |
D2 /M2.1 | Apparatus specification for keys experiments | 19 | 21 | 10-25-2007-0002 |
D2 /M2.2 | Design and costing of apparatus | 29 | 36 | 10-25-2008-0005 |
D2 /M3 | In-beam test to validate design choices | 45 | 45 | 10-25-2008-0006 |
D3 Final design report of the apparatus
No | Milestones and expected results of this task | Months due | Months achieved | Related documents |
D3 /M4 | Report on up dated design and costing of the apparatus | 47 | 47 | 10-25-2008-0008 |