The Heavy Ion Accelerator task will provide an engineering oriented design of a CW linear post-accelerator for radioactive ion beams produced with the EURISOL facility. It will have the capability to accelerate light, medium and heavy ion beams up to 100 A.MeV. It will address the requirements for beam characteristics and distribution demanded by users. It will also examine ways to accommodate the requirements for beta-beam production.
TASK HOME
INTERNAL TASK NOTE
Fast chopper construction of prototype - Final report
15/07/2009 -Task : TASK 6
15/07/2009 -Task : TASK 6
Author(s) :M. Di Giacomo
G. Le Dem
This report is the deliverable D5/M6.2
This report is the deliverable D5/M6.2
|
Download
[ 06-25-2009-0017]
( 1540KB )
Experimental Requirements - Beam and Machine Characteristics - Final Version
06/05/2009 -Task : TASK 6
06/05/2009 -Task : TASK 6
Author(s) :N.Orr
This document presents the final version of the user requirements, as far as beam and machine characteristics are concerned
This document presents the final version of the user requirements, as far as beam and machine characteristics are concerned
|
Download
[ 06-25-2009-0011]
( 76KB )
Experimental Requirements - Beams and Machine characteristics
03/11/2006 -Task : TASK 6
03/11/2006 -Task : TASK 6
Author(s) :Nigel ORR
This note presents the user requirements for the EURISOL post-accelerator
This note presents the user requirements for the EURISOL post-accelerator
|
Download
[ 06-25-2006-0004]
( 121KB )
Preliminary analysis for the HF Chopper solutions
03/11/2006 -Task : TASK 6
03/11/2006 -Task : TASK 6
Author(s) :Marco DI GIACOMO
Gwenal LE DEM
This note presents a preliminary analysis of the different solutions for the HF chopper for EURISOL post-accelerator
This note presents a preliminary analysis of the different solutions for the HF chopper for EURISOL post-accelerator
|
Download
[ 06-25-2006-0003]
( 245KB )
Normal conducting Injector
03/11/2006 -Task : TASK 6
03/11/2006 -Task : TASK 6
Author(s) :Alexander BECHTOLD
This report presents the different studies held in the frame of the Normal Conducting Injector for the EURISOL post-accelerator
This report presents the different studies held in the frame of the Normal Conducting Injector for the EURISOL post-accelerator
|
Download
[ 06-25-2006-0002]
( 768KB )
DELIVERABLES
D1 Beam dynamics calculation
No | Milestones and expected results of this task | Months due | Months achieved | Related documents |
D1/M1 | User specifications | |||
D1 /M1.1 | Preliminary specifications for beam dynamics | 6 | 6 | 06-25-2006-0004 |
D1 /M1.2 | Final specifications for beam dynamics | 17 | 16 | 06-25-2009-0011 |
D1/M2 | Beam dynamics simulation | |||
D1 /M2.1 | Preliminary design and cavity definition | 6 | 20 | 06-25-2006-0001 |
D1 /M2.2 | Detailed accelerator design | 45 | 45 | 06-25-2009-0022 |
D2 Development of normal conducting structures
No | Milestones and expected results of this task | Months due | Months achieved | Related documents |
D2 /M3.1 | Assembly of the test beam line | 6 | 6 | |
D2 /M3.2 | Development of RF system | 15 | 18 | |
D2 /M3.3 | Beam measurements | 42 | 46 | 06-25-2009-0016 |
D3 Comparison of NC and SC RFQ
No | Milestones and expected results of this task | Months due | Months achieved | Related documents |
D3 /M4.1 | Test of the LNL SC FRQ | 6 | 15 | 06-25-2009-0014 |
D3 /M4.2 | Engineering design revised | 37 | 47 | 06-25-2009-0015 |
D3 /M4.3 | Comparison of NC and SC RFQ | 37 | 53 | 06-25-2009-0023 |
D4 Development of RIB beam diagnostics
No | Milestones and expected results of this task | Months due | Months achieved | Related documents |
D4 /M5.1 | Design preparation | 37 | 37 | 06-25-2009-0020 |
D4 /M5.2 | Construction of prototype | 42 | 42 | 06-25-2009-0021 |
D4 /M5.3 | Beam test of prototype | 48 | 52 | 06-25-2009-0021 |
D5 Design and development of high frequency chopper
No | Milestones and expected results of this task | Months due | Months achieved | Related documents |
D5 /M6.1 | Design preparation | 12 | 24 | 06-25-2007-0008 |
D5 /M6.2 | Construction of prototype | 48 | 53 | 06-25-2009-0017 |
D5 /M6.3 | Beam test | 54 | 54 | 06-25-2009-0018 |
D6 Final report on task activities