Development of prototypes of several target types for direct radionuclide production that can accommodate up to 100 kW power from a beam of protons or heavier ions. This task will include development targets for beta-beam applications.CERN Link about Task 03
TASK HOME
INTERNAL TASK NOTE
D5-Comparison of targets
05/10/2009 -Task : TASK 3
05/10/2009 -Task : TASK 3
Author(s) :T. Stora, P. Bricault, L. Bruno, S. Fernandes, F. Gröschel, I. Günther, J. Lettry, M. Loiselet, E. Noah, E. Platacis, L. Zanini
This reports provides the highlights of Task#3
This reports provides the highlights of Task#3
|
Download
[ 03-25-2009-0017]
( 667KB )
Final report on oxide target prototype - Deliverable D3
14/07/2009 -Task : TASK 3
14/07/2009 -Task : TASK 3
Author(s) :S. Fernandes, E. Bouquerel, L. Bruno, R. Catherall, T. Giles, P. Kasprowicz, J. Lettry, S. Marzari, E. Noah, T. Stora, P. Bricault, M. Dombsky, F. Ames
Final report on the high power oxide prototype tests done at TRIUMF
Final report on the high power oxide prototype tests done at TRIUMF
|
Download
[ 03-25-2009-0016]
( 654KB )
Final Report on TARPIPE- Deliverable D2
14/07/2009 -Task : TASK 3
14/07/2009 -Task : TASK 3
Author(s) :E. Noah, E. Bouquerel, V. Boutellier, R. Bruetsch, R. Catherall, S. Fernandes, I. Guenther-Leopold, F. Groeschel, A. Kalt, J. Lettry, E. Manfrin, S. Marzari, T. Stora, W. Wagner, R. Wilfinger, L. Zanini
Report on the prototype target irradiation done at PSI - TARPIPE
Report on the prototype target irradiation done at PSI - TARPIPE
|
Download
[ 03-25-2009-0015]
( 14742KB )
Considerations on the proton beam shape for Refractory Metal Foil Targets
11/04/2008 -Task : TASK 3
11/04/2008 -Task : TASK 3
Author(s) :R. Wilfinger, L .Bruno
Document illustrating different proton beam steering characteristics onto the refractory foil target
Document illustrating different proton beam steering characteristics onto the refractory foil target
|
Download
[ 03-25-2008-0012]
( 3632KB )
Diffusion studies in prospective polycrystalline silicon carbide target materials for radioactive ion beam production at CERN-ISOLDE
10/03/2008 -Task : TASK 3
10/03/2008 -Task : TASK 3
Author(s) :S. Fernandes, R. Catherall, G. Izquierdo, J. Lettry, M. Menna, S. Sgobba, T. Stora
Diffusion studies in prospective SiC targets. Selection and first online operation of a sub-micrometric ISOL material.
Diffusion studies in prospective SiC targets. Selection and first online operation of a sub-micrometric ISOL material.
|
Download
[ 03-25-2008-0010]
( 851KB )
DELIVERABLES
D1 100 kW Actinide Carbide Target
No | Milestones and expected results of this task | Months due | Months achieved | Related documents |
D1 /M1.1 | Feasibility of carbide target | 13 | 15 | 03-25-2006-0005 |
D1 /M1.2 | Design of carbide target | 16 | ||
D1 /M1.3 | Test of Prototype of carbide target at ISOLDE-TRIUMF | 20 | 27 | 03-25-2008-0011 |
D1 /M1.4 | Final evaluation of carbide target tests | 28 | 33 | 03-25-2008-0010 |
D2 100 kW Metal Foil Target
No | Milestones and expected results of this task | Months due | Months achieved | Related documents |
D2 /M2.1 | Feasibility of metal foil target | 12 | 18 | 03-25-2006-0005 |
D2 /M2.2 | Design of metal foil target | 16 | 20 | 03-21-2008-0014 |
D2 /M2.3 | Test of Prototype of metal foil target at ISOLDE-PSI | 20 | 42 | |
D2 /M2.4 | Final evalutation of metal foil target tests | 48 | 53 | 03-25-2009-0015 |
D3 100 kW Oxide Target
No | Milestones and expected results of this task | Months due | Months achieved | Related documents |
D3 /M3.1 | Feasibility of oxide target | 12 | 18 | 03-25-2006-0005 |
D3 /M3.2 | Design of oxide target | 15 | 25 | |
D3 /M3.3 | Test of Prototype of oxide target at ISOLDE-PSI | 20 | 50 | |
D3 /M3.4 | Final evalutation of oxide target tests | 48 | 53 | 03-25-2009-0016 |
D4 100 kW Molten Mental target
No | Milestones and expected results of this task | Months due | Months achieved | Related documents |
D4 /M4.1 | Feasibility of molten metal target | 12 | 18 | 03-25-2006-0005 |
D4 /M4.2 | Design of molten metal target | 15 | 25 | 03-25-2007-0006 |
D4 /M4.3 | Test on prototype of molten metal target at PSI-ISOLDE | 20 | 26 | 03-25-2008-0008 |
D4 /M4.4 | Final evalutation of molten metal target tests | 28 | 33 | 03-25-2008-0000 |
D5 Comparison of targets
No | Milestones and expected results of this task | Months due | Months achieved | Related documents |
D5 /M5.1 | Final evalutation of the different targets | 54 | 54 | 03-25-2009-0017 |