TASK 3 - Direct Target

eurisol ds
Development of prototypes of several target types for direct radionuclide production that can accommodate up to 100 kW power from a beam of protons or heavier ions. This task will include development targets for beta-beam applications.CERN Link about Task 03
TASK HOME
INTERNAL TASK NOTE
D5-Comparison of targets
05/10/2009 -Task : TASK 3
Author(s) :T. Stora, P. Bricault, L. Bruno, S. Fernandes, F. Gröschel, I. Günther, J. Lettry, M. Loiselet, E. Noah, E. Platacis, L. Zanini

This reports provides the highlights of Task#3
Final report on oxide target prototype - Deliverable D3
14/07/2009 -Task : TASK 3
Author(s) :S. Fernandes, E. Bouquerel, L. Bruno, R. Catherall, T. Giles, P. Kasprowicz, J. Lettry, S. Marzari, E. Noah, T. Stora, P. Bricault, M. Dombsky, F. Ames

Final report on the high power oxide prototype tests done at TRIUMF
Final Report on TARPIPE- Deliverable D2
14/07/2009 -Task : TASK 3
Author(s) :E. Noah, E. Bouquerel, V. Boutellier, R. Bruetsch, R. Catherall, S. Fernandes, I. Guenther-Leopold, F. Groeschel, A. Kalt, J. Lettry, E. Manfrin, S. Marzari, T. Stora, W. Wagner, R. Wilfinger, L. Zanini

Report on the prototype target irradiation done at PSI - TARPIPE
Considerations on the proton beam shape for Refractory Metal Foil Targets
11/04/2008 -Task : TASK 3
Author(s) :R. Wilfinger, L .Bruno

Document illustrating different proton beam steering characteristics onto the refractory foil target
Diffusion studies in prospective polycrystalline silicon carbide target materials for radioactive ion beam production at CERN-ISOLDE
10/03/2008 -Task : TASK 3
Author(s) :S. Fernandes, R. Catherall, G. Izquierdo, J. Lettry, M. Menna, S. Sgobba, T. Stora

Diffusion studies in prospective SiC targets. Selection and first online operation of a sub-micrometric ISOL material.
DELIVERABLES

D1 100 kW Actinide Carbide Target
No Milestones and expected results of this task Months due Months achieved Related documents
D1 /M1.1 Feasibility of carbide target 13 15 03-25-2006-0005
D1 /M1.2 Design of carbide target 16
D1 /M1.3 Test of Prototype of carbide target at ISOLDE-TRIUMF 20 27 03-25-2008-0011
D1 /M1.4 Final evaluation of carbide target tests 28 33 03-25-2008-0010

D2 100 kW Metal Foil Target
No Milestones and expected results of this task Months due Months achieved Related documents
D2 /M2.1 Feasibility of metal foil target 12 18 03-25-2006-0005
D2 /M2.2 Design of metal foil target 16 20 03-21-2008-0014
D2 /M2.3 Test of Prototype of metal foil target at ISOLDE-PSI 20 42
D2 /M2.4 Final evalutation of metal foil target tests 48 53 03-25-2009-0015

D3 100 kW Oxide Target
No Milestones and expected results of this task Months due Months achieved Related documents
D3 /M3.1 Feasibility of oxide target 12 18 03-25-2006-0005
D3 /M3.2 Design of oxide target 15 25
D3 /M3.3 Test of Prototype of oxide target at ISOLDE-PSI 20 50
D3 /M3.4 Final evalutation of oxide target tests 48 53 03-25-2009-0016

D4 100 kW Molten Mental target
No Milestones and expected results of this task Months due Months achieved Related documents
D4 /M4.1 Feasibility of molten metal target 12 18 03-25-2006-0005
D4 /M4.2 Design of molten metal target 15 25 03-25-2007-0006
D4 /M4.3 Test on prototype of molten metal target at PSI-ISOLDE 20 26 03-25-2008-0008
D4 /M4.4 Final evalutation of molten metal target tests 28 33 03-25-2008-0000

D5 Comparison of targets
No Milestones and expected results of this task Months due Months achieved Related documents
D5 /M5.1 Final evalutation of the different targets 54 54 03-25-2009-0017
INVOLVED INSTITUTIONS