Search Documents
Project Documents
Eurisol Publication Policy
Annual Reports
Participants & Contributors
Governance Structure
About Eurisol
Latest Publications
In-target rare nuclei production rates with EURISOL single-stage configuration
|
Download
[ 11-21-2009-0046]
( 151KB )
Download
[ 11-21-2009-0046]
( 151KB )
A Single Bunch Selector for the Next Low β Continuous Wave Heavy Ion Beam Accelerators
Beam tests with the MAFF IH-RFQ at the IAP-Frankfurt
| Abstract
[ 06-22-2009-0066]
( 28KB )
PROPOSAL OF A HIGH DUTY CYCLE NORMAL CONDUCTING RFQ-SECTION
Preliminary study of an 88 MHz bunching RFQ for EURISOL
| Abstract
[ 06-22-2009-0065]
( 45KB )
BROCHURE ABOUT EURISOL
Latest Meetings
Final Steering Committee Meeting
21/09/2009 - 21/09/2009
T11-10
30/06/2009 - 30/06/2009
Last task 5 meeting
25/06/2009 - 26/06/2009
Task#4 meeting
25/06/2009 - 26/06/2009
Coordination Board Meeting
24/06/2009 - 24/06/2009
21/09/2009 - 21/09/2009
T11-10
30/06/2009 - 30/06/2009
Last task 5 meeting
25/06/2009 - 26/06/2009
Task#4 meeting
25/06/2009 - 26/06/2009
Coordination Board Meeting
24/06/2009 - 24/06/2009
Latest open positions
Calendar Meeting -
July
| S | M | T | W | T | F | S |
| 1 | 2 | 3 | 4 | |||
| 5 | 6 | 7 | 8 | 9 | 10 | 11 |
| 12 | 13 | 14 | 15 | 16 | 17 | 18 |
| 19 | 20 | 21 | 22 | 23 | 24 | 25 |
| 26 | 27 | 28 | 29 | 30 | 31 | |
Legenda
TaskS
Task 1 Management |
Task 2 Multi-MW Target Station |
Task 3 Direct Target |
Task 4 Fission Target |
Task 5 Safety & Radioprotection |
Task 6 Heavy Ion Accelerator Design |
Task 7 Proton Accelerator Design |
Task 8 SC Cavity Development |
Task 9 Beam Preparation |
Task 10 Physics and Instrumentation |
Task 11 Beam Intensity Calculations |
Task 12 Beta-Beam Aspects |
SIXTH FRAMEWORK PROGRAMME RESEARCH INFRASTRUCTURES ACTION
European Isotope Separation On-Line radioactive ion beam facility
European Isotope Separation On-Line radioactive ion beam facility

