Coordination and overseeing of technical, scientific, contractual, financial and administrative activities. Coordination of knowledge management: protection, use and dissemination of EURISOL DS results.
|
Internal Task note
EURISOL Design Study Final Report
The EURISOL Management Board, Edited by J.C.Cornell
This is a browser-friendly PDF version of the Final Report of the EURISOL Design Study. 13 MBytes.
D5 - Report on Cost Estimation
Management Team
Report on cost estimation of the proposed EURISOL facility
D4 - Report of Facility Layout
Management Team
Report of Facility Layout, with drawings
EURISOL Site Investigation Panel Report
Giacomo Cuttone (INFN-LNS), Don Geesaman (Argonne), Alex C. Mueller (IN2P3), Steve Myers (CERN) and ...
Report of the Site Investigation Panel
Fourth Interim Report
Y. Blumenfeld and John Cornell
Fourth Interim Report covering the period 1/2/2008 to 31/10/2008
EURISOL MERCURY TARGET EXPERIMENT: CERN SAFETY REPORT
J. Gulley (CERN SC/GS)
Report on a visit to the mercury-handling lab at IPUL. The aim was to provide recommendations to IPUL on general health and safety issues relatring to the handling of mercury, the objective being to reduce exposure to acceptable levels, so far as is reasonably practical.
Intermediate Report on the Project Web-site status
R. Battistella, D. Lazzarato
.
Eurisol in Brief
M. Lindroos and J. Cornell on behaf of the EURISOL DS Management Board
Brief description of the EURISOL facility
EURISOL : Vers une nouvelle génération de faisceaux radioactifs pour l\'Europe
Yorick Blumenfeld
Texte en Français reproduit de \"La lettre de l\'IPN Orsay. (internal laboratory publication)
EURISOL : European Collaboration towards the Ultimate ISOL Facility
Yorick Blumenfeld
Presentation given at the meeting of the OECD Global Science Forum Working Group ob Nuclear Physics, Rome, Oct 10-11 2006
Project Management at INFN-LNL from 2004 to 2006
Rosella Battistella
Project Management at INFN-LNL from 2004 to 2006
|
 |
|