eurisol ds
Go to EURISOL DS Home
TASK 1 Management

 

  ANNUAL REPORTS  |  INTERIM ANNUAL REPORTS  |  PLANNIG GUIDELINES  |  FOUR MONTH REPORTS 

ANNUAL REPORTS

FIRST ANNUAL REPORT - PERIOD FROM 1/2/2005 TO 31/1/2006


DELIVERABLE: TASK 1 - D1-M1 WEB SITE SET UP


DELIVERABLE: TASK 4 D1-M1 Neutronic calculations report


DELIVERABLE: TASK 9 - D1-M1 Definition of reference design


EURISOL DS SECOND ANNUAL REPORT
The EURISOL Management Board

EURISOL Design Study Second Annual Report 01/02/2006-31/01/2007

DELIVERABLE: TASK 4 - D2-M2.1 Preliminary Design of Vacuum System for the Fission Target
O. Alyakrinskiy, M. Barbui, Luigi B. Tecchio, M. Tonezzer

EUROPEAN ISOTOPE SEPARATION ON-LINE RADIOACTIVE ION BEAM FACILITY

DELIVERABLE: TASK 6 - M1.2 EXPERIMENTAL REQUIREMENTS – BEAM AND MACHINE CHARACTERISTICS


DELIVERABLE TASK 6 - M2.1 Beam Dynamics:preliminary design
Jean-Luc Biarrotte, Patrick Bertrand

EUROPEAN ISOTOPE SEPARATION ON-LINE RADIOACTIVE ION BEAM FACILITY

DELIVERABLE TASK 6 - M6.1 Design preparation of high frequency chopper
M.Di Giacomo, G.Le Dem

EUROPEAN ISOTOPE SEPARATION ON-LINE RADIOACTIVE ION BEAM FACILITY

DELIVERABLE TASK6 M3 Normal Conducting RFQ-intermediate report
Alexander Bechtold

EUROPEAN ISOTOPE SEPARATION ON-LINE RADIOACTIVE ION BEAM FACILITY

DELIVERABLE TASK 9 - D6 Preliminary breeding research and development
Pierre Delahaye, Oliver Kester, Thierry Lamy, Fredrik Wenander, Holger Zimmermann

EUROPEAN ISOTOPE SEPARATION ON-LINE RADIOACTIVE ION BEAM FACILITY

DELIVERABLE TASK 10 - M1.2 Selection of key experiments with the associated instrumentation
TASK 10

Proton-rich N = Z isotopes in the vicinity of 100Sn will be used to determine the super-allowed beta decay ft value and to determine the vector coupling constant gv of the weak interaction. The measurements with high-Z isotopes are crucial to test the nuclear- structure dependent corrections needed to etermine gv and to determine with improve accuracy the Vud matrix element of the Cabbibo-Kobayashi-Maskawa quark mixing matrix.


DELIVERABLE TASK 10 - M2.1 Apparatus specification for key experiments
TASK 10

EUROPEAN ISOTOPE SEPARATION ON-LINE RADIOACTIVE ION BEAM FACILITY

DELIVERABLE TASK 11 D1 Heavy Ion requirement for driver accelerator
K.-H. Schmidt, A. Kelic, S. Lukic, M. V. Ricciardi, M. Veselsky

Possibilities are studied for the optimization of EURISOL rare nuclide yields in specific regions of the nuclear chart by building the driver accelerator in a way that enables accelerating several additional beam species, to specific energies, besides the baseline 1 GeV proton beam. Nuclide production rates with these driver beams are compared to the production rates expected with the 1 GeV proton beam in the direct-production and the high-power-converter scenarios. Arguments are presented to show that several additional driver-beam scenarios could provide substantial benefit for the production of nuclides in specific regions of the nuclear chart....

EURISOL DS THIRD ANNUAL REPORT
The EURISOL Management Board

EURISOL Design Study Third Annual Report 01/02/2007-31/01/2008

FOURTH ANNUAL REPORT - PERIOD FROM 1/2/2008 TO 31/1/2009


DELIVERABLE TASK1 - D3 REPORT ON SITE OPTION


DELIVERABLE TASK2 - D3 ENGINEERING DESIGN CONSTRUCTION OF FUNCTIONAL HG LOOP


DELIVERABLE TASK5 - D2 RADIOACTIVITY CONTROL, SAFETY AND RISK


DELIVERABLE TASK6 - D1 BEAM DYNAMICS CALCULATION


DELIVERABLE TASK6 - D2 DEVELOPMENT OF NORMAL RFQ STRUCTURE


DELIVERABLE TASK 10 - M4 UPDATED DESIGN AND COSTING OF APPARATUS


EURISOL DS FIFTH PERIODIC REPORT
.

.

Task 4 Detailed Final Report
Luigi Tecchio et al.

Additional material

Task 2 - Detailed version of Final Report - PART 1
Yacine Kadi et al

Additional material relating to the Final Report

Task 2 - Detailed version of Final Report - PART 2
Yacine Kadi et al.

Additional material relating to the Final Report.
Part 1 + Part 2 = 24 Mbytes

Task 5 - Detailed version of Final Report
Jean-Christophe David et al.

Additional material relating to the Final Report

Task 6 - Detailed version of Final Report
Marie-Hélène Moscatello et al.

Additional material relating to the Final Report

Task 7 - Detailed version of Final Report
Alberto Facco et al.

Additional material relating to the Final Report

Task 9 - Detailed version of Final Report
Ari Jokinen et al.

Additional material relating to the Final Report

Task 10 - Detailed version of Final Report
Robert Page et al.

Additional material relating to the Final Report

Task 11 - Detailed version of Final Report
Aleksandra Kelic et al.

Additional material relating to the Final Report

EURISOL DS FINAL REPORT
The EURISOL Management Board, Edited by J.C.Cornell

This is a browser-friendly PDF version of the Final Report of the EURISOL Design Study. 13 MBytes.



INTERIM ANNUAL REPORTS

FIRST INTERIM ANNUAL REPORT PERIOD FROM 1/2/2005 TO 31/10/2005


Second Interim Annual Report
Yorick Blumenfeld and Celine Hovaguimian

Second Interim Annual Report from February 1st 2006 to October 31st 2006

Third Interim Annual Report
Yorick BLUMENFELD

From 1st February 2007 to 31st October 2007

Fourth Interim Annual Report
Y. Blumenfeld and J. Cornell

Fourth Interim Annual report covering the period from 1/2/2008 to 31/10/2008



PLANNIG GUIDELINES

SECOND YEAR PLANNING GUIDELINES PERIOD FROM 1/2/2006 TO 31/1/2007


Third Year Planning Guidelines
Yorick Blumenfeld and Celine Hovaguimian

Third Year Planning Guidelines from February 1st 2007 to January 31st 2008

Four Year Planning Guidelines
Yorick BLUMENFELD

From 1st February 2008 to 31st January 2009

Fifth Planning guidelines
Y. Blumenfeld and J. Cornell

Planning Guidelines for the period 01/02/2009 to 31/07/2009



FOUR MONTH REPORTS

SECOND YEAR - FOUR MONTH REPORT



Management Support Team  |  Project Leader  |  Site Developer