ANNUAL REPORTS
| INTERIM ANNUAL REPORTS
| PLANNIG GUIDELINES
| FOUR MONTH REPORTS
FIRST ANNUAL REPORT - PERIOD FROM 1/2/2005 TO 31/1/2006
DELIVERABLE: TASK 1 - D1-M1 WEB SITE SET UP
DELIVERABLE: TASK 4 D1-M1 Neutronic calculations report
DELIVERABLE: TASK 9 - D1-M1 Definition of reference design
EURISOL DS SECOND ANNUAL REPORT
The EURISOL Management Board
EURISOL Design Study Second Annual Report 01/02/2006-31/01/2007
DELIVERABLE: TASK 4 - D2-M2.1 Preliminary Design of Vacuum System for the Fission Target
O. Alyakrinskiy, M. Barbui, Luigi B. Tecchio, M. Tonezzer
EUROPEAN ISOTOPE SEPARATION ON-LINE RADIOACTIVE ION BEAM FACILITY
DELIVERABLE: TASK 6 - M1.2 EXPERIMENTAL REQUIREMENTS – BEAM AND MACHINE CHARACTERISTICS
DELIVERABLE TASK 6 - M2.1 Beam Dynamics:preliminary design
Jean-Luc Biarrotte, Patrick Bertrand
EUROPEAN ISOTOPE SEPARATION ON-LINE RADIOACTIVE ION BEAM FACILITY
DELIVERABLE TASK 6 - M6.1 Design preparation of high frequency chopper
M.Di Giacomo, G.Le Dem
EUROPEAN ISOTOPE SEPARATION ON-LINE RADIOACTIVE ION BEAM FACILITY
DELIVERABLE TASK6 M3 Normal Conducting RFQ-intermediate report
Alexander Bechtold
EUROPEAN ISOTOPE SEPARATION ON-LINE RADIOACTIVE ION BEAM FACILITY
DELIVERABLE TASK 9 - D6 Preliminary breeding research and development
Pierre Delahaye, Oliver Kester, Thierry Lamy, Fredrik Wenander, Holger Zimmermann
EUROPEAN ISOTOPE SEPARATION ON-LINE RADIOACTIVE ION BEAM FACILITY
DELIVERABLE TASK 10 - M1.2 Selection of key experiments with the associated instrumentation
TASK 10
Proton-rich N = Z isotopes in the vicinity of 100Sn will be used to determine the super-allowed beta decay ft value and to determine the vector coupling constant gv of the weak interaction. The measurements with high-Z isotopes are crucial to test the nuclear- structure dependent corrections needed to etermine gv and to determine with improve accuracy the Vud matrix element of the Cabbibo-Kobayashi-Maskawa quark mixing matrix.
DELIVERABLE TASK 10 - M2.1 Apparatus specification for key experiments
TASK 10
EUROPEAN ISOTOPE SEPARATION ON-LINE RADIOACTIVE ION BEAM FACILITY
DELIVERABLE TASK 11 D1 Heavy Ion requirement for driver accelerator
K.-H. Schmidt, A. Kelic, S. Lukic, M. V. Ricciardi, M. Veselsky
Possibilities are studied for the optimization of EURISOL rare nuclide yields in specific regions of the nuclear chart by building the driver accelerator in a way that enables accelerating several additional beam species, to specific energies, besides the baseline 1 GeV proton beam. Nuclide production rates with these driver beams are compared to the production rates expected with the 1 GeV proton beam in the direct-production and the high-power-converter scenarios. Arguments are presented to show that several additional driver-beam scenarios could provide substantial benefit for the production of nuclides in specific regions of the nuclear chart....
EURISOL DS THIRD ANNUAL REPORT
The EURISOL Management Board
EURISOL Design Study Third Annual Report 01/02/2007-31/01/2008
FOURTH ANNUAL REPORT - PERIOD FROM 1/2/2008 TO 31/1/2009
DELIVERABLE TASK1 - D3 REPORT ON SITE OPTION
DELIVERABLE TASK2 - D3 ENGINEERING DESIGN CONSTRUCTION OF FUNCTIONAL HG LOOP
DELIVERABLE TASK5 - D2 RADIOACTIVITY CONTROL, SAFETY AND RISK
DELIVERABLE TASK6 - D1 BEAM DYNAMICS CALCULATION
DELIVERABLE TASK6 - D2 DEVELOPMENT OF NORMAL RFQ STRUCTURE
DELIVERABLE TASK 10 - M4 UPDATED DESIGN AND COSTING OF APPARATUS
EURISOL DS FIFTH PERIODIC REPORT
.
.
Task 4 Detailed Final Report
Luigi Tecchio et al.
Additional material
Task 2 - Detailed version of Final Report - PART 1
Yacine Kadi et al
Additional material relating to the Final Report
Task 2 - Detailed version of Final Report - PART 2
Yacine Kadi et al.
Additional material relating to the Final Report.
Part 1 + Part 2 = 24 Mbytes
Task 5 - Detailed version of Final Report
Jean-Christophe David et al.
Additional material relating to the Final Report
Task 6 - Detailed version of Final Report
Marie-Hélène Moscatello et al.
Additional material relating to the Final Report
Task 7 - Detailed version of Final Report
Alberto Facco et al.
Additional material relating to the Final Report
Task 9 - Detailed version of Final Report
Ari Jokinen et al.
Additional material relating to the Final Report
Task 10 - Detailed version of Final Report
Robert Page et al.
Additional material relating to the Final Report
Task 11 - Detailed version of Final Report
Aleksandra Kelic et al.
Additional material relating to the Final Report
EURISOL DS FINAL REPORT
The EURISOL Management Board, Edited by J.C.Cornell
This is a browser-friendly PDF version of the Final Report of the EURISOL Design Study. 13 MBytes.
FIRST INTERIM ANNUAL REPORT PERIOD FROM 1/2/2005 TO 31/10/2005
Second Interim Annual Report
Yorick Blumenfeld and Celine Hovaguimian
Second Interim Annual Report from February 1st 2006 to October 31st 2006
Third Interim Annual Report
Yorick BLUMENFELD
From 1st February 2007 to 31st October 2007
Fourth Interim Annual Report
Y. Blumenfeld and J. Cornell
Fourth Interim Annual report covering the period from 1/2/2008 to 31/10/2008
SECOND YEAR PLANNING GUIDELINES PERIOD FROM 1/2/2006 TO 31/1/2007
Third Year Planning Guidelines
Yorick Blumenfeld and Celine Hovaguimian
Third Year Planning Guidelines from February 1st 2007 to January 31st 2008
Four Year Planning Guidelines
Yorick BLUMENFELD
From 1st February 2008 to 31st January 2009
Fifth Planning guidelines
Y. Blumenfeld and J. Cornell
Planning Guidelines for the period 01/02/2009 to 31/07/2009
SECOND YEAR - FOUR MONTH REPORT
|
|