TASK 6 Heavy Ion Accelerator Design
|
|
|
28/02/2007 - Internal Task note Preliminary Design of Vacuum System for the Fission Target
Author(s) : O. Alyakrinskiy, M. Barbui, Luigi B. Tecchio, M. Tonezzer
The preliminary design of vacuum system for the fission target option is discussed. The design is based on the reference option for fission target which includes the 4 MMW Hg neutron converter (Intermediate Solution, IS) and 8 Uranium Carbide fission targets around it to produce (in-target) more than 1015 f/s fission fragments. Eight independent radioactive ion beams are delivered in a direction anti-parallel to the incoming proton beam and prepared to be delivered to the users. The design of vacuum system considers different working conditions and safety requirements, in term of vacuum level, radiation resistance materials, remote handling and radioactive gas evacuation. |
Task :
TASK 4
Code :
04-25-2007-0002
Inserted By :
Luigi Tecchio
Inserted at :
28/02/2007
|
| |
|
Download ( 222KB )
|
|
| |
|
|
| |
CODE EXPLANATION:
AA-BB-CCCC-DDDD
AA = TASK NUMBER
BB = TYPE OF THE DOCUMENT:
21 = JOURNAL ARTICLE
22 = ABSTRACT
23 = PROCEEDING
25 = INTERNAL TASK NOTE
27 = USEFUL DOCUMENTS
28 = CONSORTIUM AGREEMENT
29 = FINANCIAL DOCUMENTS
30 = CONTRACT
31 = ANNUAL REPORTS
32 = INTERIM ANNUAL REPORTS
33 = PLANNIG GUIDELINES
34 = FOUR MONTH REPORTS
CCCC = YEAR
DDDD = DOCUMENT NUMBER
|
|
|
|
Management Support Team
| Project Leader |
Site Developer
|