Preliminary design of a Rapid Cycling Synchrotron for the EURISOL Beta-Beam Facility

Author(s) : A. Lachaize, A. Tkatchenko

General considerations concerning the optical design of the Rapid Cycling Synchrotron (RCS) for the Beta Beam facility have been presented on the occasion of the two Beta Beam task meetings held at CERN in April 2005 and at Saclay in last October [1].
Following the trends identified during these meetings and taking into account the updated baseline scenario described in [2], we present here the main characteristics of a RCS pulsed at 10 Hz and capable of accelerating ion beams to energies corresponding to 3.2 GeV protons (magnetic rigidity of 13.4 T.m). A parameter list for the main magnets and for the accelerating system is proposed and first simulation results of the multiturn injection and the fast extraction schemes are given.
Task :
TASK 12

Code :

12-25-2007-0006

Inserted By :
Michael Benedikt

Inserted at :
16/11/2006

  | Download ( 1347KB )  
 
 
 


CODE EXPLANATION: AA-BB-CCCC-DDDD

AA = TASK NUMBER

BB = TYPE OF THE DOCUMENT:

21 = JOURNAL ARTICLE
22 = ABSTRACT
23 = PROCEEDING
25 = INTERNAL TASK NOTE
27 = USEFUL DOCUMENTS
28 = CONSORTIUM AGREEMENT
29 = FINANCIAL DOCUMENTS
30 = CONTRACT
31 = ANNUAL REPORTS
32 = INTERIM  ANNUAL REPORTS
33 = PLANNIG GUIDELINES
34 = FOUR MONTH REPORTS

CCCC = YEAR

DDDD = DOCUMENT NUMBER



Management Support Team  |  Project Leader  |  Site Developer