From 30/06/2009 to 30/06/2009
|
|
|
T11-10 T11-10 Location: GSI
Final Task 11 meeting
|
|
|
|
From 25/06/2009 to 26/06/2009
|
|
|
Task#4 meeting T04-05 Location: Saclay
The last task 4 meeting will be mainly devoted to discussion on the different reports which must be provided. The meeting will be partially joint to task 5
|
|
|
|
From 25/06/2009 to 26/06/2009
|
|
|
Last task 5 meeting JM-27 Location: CEA-Saclay (France)
This last task meeting will address the different reports which must be provided
|
|
|
|
From 28/05/2009 to 28/05/2009
|
|
|
Costing Workshop JM-26 Location: CERN, Geneva, Room 104-R-B09
Workshop on costing for Task leaders
10 a.m. to 3.30 p.m.
|
|
|
|
From 25/05/2009 to 25/05/2009
|
|
|
27th technical meeting of the multi-MW task: review on the outstanding work on the EURISOL DS projec... T02-27 Location: PSI (Paul Scherrer Institut, Villigen, CH)
The objective of this meeting was to discuss the progress achieved and to review the work load outstanding on the EURISOL DS project and especially on the drafting of the remaining deliverables.
|
|
|
|
From 18/05/2009 to 22/05/2009
|
|
|
T11-09 T11-09 Location: GSI
Work on the TASK 11 data base
Participants: Wojtek Gawlikowitz (UW), Aleksandra Kelic (GSI), Maria Valentina Ricciardi (GSI)
|
|
|
|
From 18/05/2009 to 18/05/2009
|
|
|
27th technical meeting of the multi-MW task: exchange of information about Eurisol and Conditioning ... T02-26 Location: CERN
P. Allenspach and H.-F. Beer from PSI visited the task#2 team in order to discuss the issue about the final disposal of the liquid mercury waste generated by the EURISOL facility.
|
|
|
|
From 21/04/2009 to 21/04/2009
|
|
|
25th technical meeting of the multi-MW task: review on the experimental data analysis T02-25 Location: PSI (Paul Scherrer Institut, Villigen, CH)
The objective of this meeting was to discuss the progress achieved and to review the work load remaining concerning the experimental data analysis with respect to METEX 1 and METEX 2.
|
|
|
|
From 02/04/2009 to 02/04/2009
|
|
|
Task6 11th meeting T06-11 Location: PISA
A status of each remaining deliverable will be presented during this meeting
|
|
|
|
From 02/04/2009 to 02/04/2009
|
|
|
Planning of the EURISOL 100 kW liquid metal target diffusion chamber and loop prototypes T03-11 Location: CERN R26-1-022
Scope of the meeting:
- Status of the current diffusion chamber prototype operating at IPUL.
- Test program to be carried out at IPUL on existing prototype diffusion chamber.
- Design and planning of the diffusion chamber prototype to be shipped to CERN for OFFLINE tests.
- Discussion of the possible extensions of such a loop for tests at ISOLDE ONLINE.
|