TASK 6 Heavy Ion Accelerator Design
|
|
|
08/07/2009 - Internal Task note Improved Design of EURISOL Fission Target Systems and Handling
Author(s) : F. Negoita, L. Serbina, E. Udup, O. Alyakrinskiy, M. Barbui, J. Bermudez, L.B. Tecchio, Y. Kadi, C. Kharoua, Y. Romanets
The report discusses the constraints, solutions and options for integration of the main systems needed to assure the operation and maintenance/exchange of the fission target – ion sources assemblies capable to withstand very high neutron fluxes around EURISOL multi-MW neutron converter, to provide the desired fission rate of 10e15 fis./sec. and to extract with highest possible efficiencies the fission products as radioactive ion beam. Adapting the concepts developed for a single fission target within PIAFE and MAFF projects, simultaneous operation of six fission targets was proposed for EURISOL. A first design following these concepts was presented in a previous report. Here we describe several improvements implemented in the design for a more efficient, more reliable and safer operation. An optimized layout of the part of the EURISOL MMW station related to fission target services and handling is proposed as well. |
Task :
TASK 4
Code :
04-25-2009-0016
Inserted By :
Luigi Tecchio
Inserted at :
08/07/2009
|
| |
|
Download ( 1911KB )
|
|
| |
|
|
| |
CODE EXPLANATION:
AA-BB-CCCC-DDDD
AA = TASK NUMBER
BB = TYPE OF THE DOCUMENT:
21 = JOURNAL ARTICLE
22 = ABSTRACT
23 = PROCEEDING
25 = INTERNAL TASK NOTE
27 = USEFUL DOCUMENTS
28 = CONSORTIUM AGREEMENT
29 = FINANCIAL DOCUMENTS
30 = CONTRACT
31 = ANNUAL REPORTS
32 = INTERIM ANNUAL REPORTS
33 = PLANNIG GUIDELINES
34 = FOUR MONTH REPORTS
CCCC = YEAR
DDDD = DOCUMENT NUMBER
|
|
|
|
Management Support Team
| Project Leader |
Site Developer
|