eurisol ds
Go to EURISOL DS Home
TASK 6 Heavy Ion Accelerator Design

 

Document Details






05/10/2005 - Internal Task note

EURISOL Multi-MW Target: Preliminary Study

Author(s) : A.Herrera-Martínez and Y.Kadi

This technical note summarises the design calculations performed within Task #2 of the EURopean Isotope Separation On-Line Radioactive Ion Beam Facility Design Study (EURISOL DS).
A preliminary study was carried out in order to determine the optimum value of relevant parameters in the target design. Different scenarios were simulated using the Monte Carlo code FLUKA. Namely, sensitivity studies were performed to assess the impact of the projectile particle energy on the neutronics and energy deposition in the spallation target. The optimum target dimension was also studied for every case as well as the proper target material for the liquid metal proton-to-neutron converter, since mercury and lead-bismuth eutectic are reasonable options. The effect of the beam width on the power densities was also evaluated, taking into account the geometrical limitations of the facility. Finally, a comparison between protons and deuterons as primary particles was performed, acknowledging the limitations of using FLUKA for these simulations.
The results of these calculations show the benefit of using protons as primary particles and increasing their energy, in order to reduce the high power densities occurring in the first few centimetres downstream from the interaction point. Particularly, a 2 GeV proton beam with a ? ~15 mm Gaussian distribution on a 15 cm radius 50 cm long target seems a suitable trade between increasing the neutron and fission yields and reducing the power densities in both, the liquid metal and fission targets.
Task :
TASK 2

Code :

02-25-2005-0001

Inserted By :
WEBMASTER

Inserted at :
05/10/2005

  | Download ( 5431KB )  
 
 
 


CODE EXPLANATION: AA-BB-CCCC-DDDD

AA = TASK NUMBER

BB = TYPE OF THE DOCUMENT:

21 = JOURNAL ARTICLE
22 = ABSTRACT
23 = PROCEEDING
25 = INTERNAL TASK NOTE
27 = USEFUL DOCUMENTS
28 = CONSORTIUM AGREEMENT
29 = FINANCIAL DOCUMENTS
30 = CONTRACT
31 = ANNUAL REPORTS
32 = INTERIM  ANNUAL REPORTS
33 = PLANNIG GUIDELINES
34 = FOUR MONTH REPORTS

CCCC = YEAR

DDDD = DOCUMENT NUMBER



Management Support Team  |  Project Leader  |  Site Developer