TASK 6 Heavy Ion Accelerator Design
|
|
|
12/12/2007 - Internal Task note EURISOL Fission Target Design adapting MAFF concept
Author(s) : O. Alyakrinskiy, M. Barbui, L.B. Tecchio (INFN-Legnaro)
F. Negoita, L. Serbina, E. Udup (NIPNE-Bucharest)
The first two version of design as described in “Fission Target Design” report available on Task 4 pages on EURISOL web-site (http://www.eurisol.org), integrating a number of eight fission targets and ion sources around the multiMW Hg target inside one large vacuum vessel, have raised several concerns about the viability of the concept. Following the decision of EURISOL-DS Management Board, the adaptation of solutions proposed for MAFF project was studied from different points of view within tasks 2-4. In the present report, the new engineering design coming out form these studies is described and discussed. |
Task :
TASK 4
Code :
04-25-2007-0010
Inserted By :
Luigi Tecchio
Inserted at :
12/12/2007
|
| |
|
Download ( 1035KB )
|
|
| |
|
|
| |
CODE EXPLANATION:
AA-BB-CCCC-DDDD
AA = TASK NUMBER
BB = TYPE OF THE DOCUMENT:
21 = JOURNAL ARTICLE
22 = ABSTRACT
23 = PROCEEDING
25 = INTERNAL TASK NOTE
27 = USEFUL DOCUMENTS
28 = CONSORTIUM AGREEMENT
29 = FINANCIAL DOCUMENTS
30 = CONTRACT
31 = ANNUAL REPORTS
32 = INTERIM ANNUAL REPORTS
33 = PLANNIG GUIDELINES
34 = FOUR MONTH REPORTS
CCCC = YEAR
DDDD = DOCUMENT NUMBER
|
|
|
|
Management Support Team
| Project Leader |
Site Developer
|