TASK 6 Heavy Ion Accelerator Design
|
|
|
03/09/2009 - Internal Task note EURISOL-DS Overall Design of the Multi-MW Target Station
Author(s) : Olivier Choisnet, Cyril Kharoua, Yacine Kadi, Karel Samec (CERN)
The EURISOL Design Study investigated the feasibility of a complex instrument to push back the boundaries of current physics knowledge amidst today’s ever-increasing need for realism due to constraints imposed by safety, performance and, not least, budgetary responsibility.
In order to attend to these concerns, the EURISOL Multi-Megawatt converter target, its associated fission targets and the three 100 kW direct targets are all integrated into a single facility housing the ancillary equipment as well. The overall layout of the facility, its functional break-down and the main modes of operation are presented in the current report. |
Task :
TASK 2
Code :
02-25-2009-0046
Inserted By :
Yacine Kadi
Inserted at :
03/09/2009
|
| |
|
Download ( 2687KB )
|
|
| |
|
|
| |
CODE EXPLANATION:
AA-BB-CCCC-DDDD
AA = TASK NUMBER
BB = TYPE OF THE DOCUMENT:
21 = JOURNAL ARTICLE
22 = ABSTRACT
23 = PROCEEDING
25 = INTERNAL TASK NOTE
27 = USEFUL DOCUMENTS
28 = CONSORTIUM AGREEMENT
29 = FINANCIAL DOCUMENTS
30 = CONTRACT
31 = ANNUAL REPORTS
32 = INTERIM ANNUAL REPORTS
33 = PLANNIG GUIDELINES
34 = FOUR MONTH REPORTS
CCCC = YEAR
DDDD = DOCUMENT NUMBER
|
|
|
|
Management Support Team
| Project Leader |
Site Developer
|