eurisol ds
Go to EURISOL DS Home
TASK 6 Heavy Ion Accelerator Design

 

Document Details






24/07/2009 - Internal Task note

EURISOL-DS Multi-MW Target: Risk Register

Author(s) : C. Kharoua and Y. Kadi (CERN)

The purpose of the risk register is to identify and rank the risk inherent to the installation, operation, maintenance, dismantling and disposal of each item of the facility and to propose ways of mitigating such risks.
It is an important input for the safety report which will be mandatory for the study towards the construction of the EURISOL Facility.
Task :
TASK 2

Code :

02-25-2009-0036

Inserted By :
Yacine Kadi

Inserted at :
24/07/2009

  | Download ( 59KB )  
 
 
 


CODE EXPLANATION: AA-BB-CCCC-DDDD

AA = TASK NUMBER

BB = TYPE OF THE DOCUMENT:

21 = JOURNAL ARTICLE
22 = ABSTRACT
23 = PROCEEDING
25 = INTERNAL TASK NOTE
27 = USEFUL DOCUMENTS
28 = CONSORTIUM AGREEMENT
29 = FINANCIAL DOCUMENTS
30 = CONTRACT
31 = ANNUAL REPORTS
32 = INTERIM  ANNUAL REPORTS
33 = PLANNIG GUIDELINES
34 = FOUR MONTH REPORTS

CCCC = YEAR

DDDD = DOCUMENT NUMBER



Management Support Team  |  Project Leader  |  Site Developer