eurisol ds

 

Document Details






13/08/2009 - Internal Task note

EURISOL-DS Multi-MW Target: Cost Analysis for a Proposed Development Phase

Author(s) : Karel Samec, Mats Lindroos, Yacine Kadi, Etam Noah, Jacques Lettry (CERN) Werner Wagner, Knud Thomsen, Jacek Patorski, Sergej Dementevjs, (PSI) Anatoli Zik, Erik Platacis (IPUL)

The EURISOL Design Study has reached final completion and the three institutes, CERN, IPUL and PSI, participating in the development of the Multi-Megawatt target station have met the objective of a reliable, affordable and credible design. The costs involved in the full development of such a target are forecast to reach 200 million €, approximately 15% of the total costs of the EURISOL facility.
A breakdown of the costs is presented as well as an outline of future possible R&D efforts aimed at improving reliability and safety of the facility. Another important goal of the proposed R&D is to minimise development risk by focusing resources, early on in the project, on areas identified as presenting a particular risk. An example clearly identified in the study would be the conditioning of the contaminated Mercury, both during the lifetime of the facility and after decommissioning.
Task :
TASK 2

Code :

02-25-2009-0043

Inserted By :
Yacine Kadi

Inserted at :
13/08/2009

  | Download ( 2843KB )  
 
 
 


CODE EXPLANATION: AA-BB-CCCC-DDDD

AA = TASK NUMBER

BB = TYPE OF THE DOCUMENT:

21 = JOURNAL ARTICLE
22 = ABSTRACT
23 = PROCEEDING
25 = INTERNAL TASK NOTE
27 = USEFUL DOCUMENTS
28 = CONSORTIUM AGREEMENT
29 = FINANCIAL DOCUMENTS
30 = CONTRACT
31 = ANNUAL REPORTS
32 = INTERIM  ANNUAL REPORTS
33 = PLANNIG GUIDELINES
34 = FOUR MONTH REPORTS

CCCC = YEAR

DDDD = DOCUMENT NUMBER