eurisol ds
Go to EURISOL DS Home
TASK 6 Heavy Ion Accelerator Design

 

Document Details






28/02/2007 - Internal Task note

EURISOL-DS Multi-MW Target-Comparative Neutronic Performance of the Baseline-Configuration vs. the Hg-Jet Option

Author(s) : Adonai Herrera-Martínez, Yacine Kadi, and the EURISOL-DS Task#2 collaboration

This technical report summarises the comparative study between several design options for the Multi-MW target station performed within Task #2 of the European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study.
Task :
TASK 4

Code :

04-25-2007-0003

Inserted By :
Luigi Tecchio

Inserted at :
28/02/2007

  | Download ( 780KB )  
 
 
 


CODE EXPLANATION: AA-BB-CCCC-DDDD

AA = TASK NUMBER

BB = TYPE OF THE DOCUMENT:

21 = JOURNAL ARTICLE
22 = ABSTRACT
23 = PROCEEDING
25 = INTERNAL TASK NOTE
27 = USEFUL DOCUMENTS
28 = CONSORTIUM AGREEMENT
29 = FINANCIAL DOCUMENTS
30 = CONTRACT
31 = ANNUAL REPORTS
32 = INTERIM  ANNUAL REPORTS
33 = PLANNIG GUIDELINES
34 = FOUR MONTH REPORTS

CCCC = YEAR

DDDD = DOCUMENT NUMBER



Management Support Team  |  Project Leader  |  Site Developer