eurisol ds
Go to EURISOL DS Home
TASK 6 Heavy Ion Accelerator Design

 

Document Details






31/07/2009 - Internal Task note

EURISOL-DS Multi-MW Target: A safe way to run the CGS converter

Author(s) : Cyril Kharoua, Yacine Kadi, Karel Samec (CERN)

This technical note summarizes the design calculations performed within Task#2 of the European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study (EURISOL-DS) on the safety hull of the CGS design of the mercury converter. A study was carried out in order to propose a configuration for the safety hull and the connection between the target and the accelerator. The results of these calculations show a layout and a design proposal for the safety barrier of the EURISOL DS target design.
Task :
TASK 2

Code :

02-25-2009-0040

Inserted By :
Yacine Kadi

Inserted at :
31/07/2009

  | Download ( 1512KB )  
 
 
 


CODE EXPLANATION: AA-BB-CCCC-DDDD

AA = TASK NUMBER

BB = TYPE OF THE DOCUMENT:

21 = JOURNAL ARTICLE
22 = ABSTRACT
23 = PROCEEDING
25 = INTERNAL TASK NOTE
27 = USEFUL DOCUMENTS
28 = CONSORTIUM AGREEMENT
29 = FINANCIAL DOCUMENTS
30 = CONTRACT
31 = ANNUAL REPORTS
32 = INTERIM  ANNUAL REPORTS
33 = PLANNIG GUIDELINES
34 = FOUR MONTH REPORTS

CCCC = YEAR

DDDD = DOCUMENT NUMBER



Management Support Team  |  Project Leader  |  Site Developer