TASK 6 Heavy Ion Accelerator Design
|
|
|
03/09/2009 - Internal Task note EURISOL-DS Multi-Megawatt Target: Remote Handling Equipment
Author(s) : Cyril Kharoua, Olivier Choisnet, Yacine Kadi, Karel Samec (CERN)
The design proposed within Task #2 of the EURISOL Design Study for the remote handling of the mercury converter target and its associated loop is presented with particular emphasis on achieving rapid turn-around during routine maintenance.
The converter target needs to be completely exchanged every four months due to the high irradiation damage sustained. Other components are less susceptible to damage but may need periodic maintenance; in particular the on-line isotopic separation unit in the mercury loop. |
Task :
TASK 2
Code :
02-25-2009-0044
Inserted By :
Yacine Kadi
Inserted at :
03/09/2009
|
| |
|
Download ( 1540KB )
|
|
| |
|
|
| |
CODE EXPLANATION:
AA-BB-CCCC-DDDD
AA = TASK NUMBER
BB = TYPE OF THE DOCUMENT:
21 = JOURNAL ARTICLE
22 = ABSTRACT
23 = PROCEEDING
25 = INTERNAL TASK NOTE
27 = USEFUL DOCUMENTS
28 = CONSORTIUM AGREEMENT
29 = FINANCIAL DOCUMENTS
30 = CONTRACT
31 = ANNUAL REPORTS
32 = INTERIM ANNUAL REPORTS
33 = PLANNIG GUIDELINES
34 = FOUR MONTH REPORTS
CCCC = YEAR
DDDD = DOCUMENT NUMBER
|
|
|
|
Management Support Team
| Project Leader |
Site Developer
|