EURISOL-DS METEX1: Hydraulic mercury test of the target mock-up. Technical requirements on mercury loop

Author(s) : S.Dementjev, R.Milenkovic, and F.Groeschel

The target hydraulic test will be carried out on IPUL (Latvia) mercury loop DN100. The loop will be adapted for the experiment on the basis of these technical requirements.
Task :
TASK 2

Code :

02-25-2008-0021

Inserted By :
Yacine Kadi

Inserted at :
27/11/2008