TASK 6 Heavy Ion Accelerator Design
|
|
|
03/09/2009 - Internal Task note Deliverable D5: The Multi-Megawatt Target Station (Final Report)
Author(s) : Karel Samec et al. (CERN, IPUL, ITN, PSI)
The Eurisol initiative seeks to develop an isotope production facility to provide the scientific community with the means to achieving high yields of isotopes and extending the variety of isotopes thus produced towards more exotic types rarely seen in existing facilities.
The Multi-MW converter target at the heart of the projected facility is designed to create isotopes by fissioning uranium carbide (UC) target arranged coaxially around a 4 MW converter target. It is therefore essential that the target be as compact as possible to avoid losing neutrons to capture whilst maximising the neutron flux to enhance the number of fissions per second in the UC targets.
The proposed ISOL facility would use both (a) several 100 kW proton beams on a thick solid target to produce
RIBs directly, and (b) a liquid metal 4 MW ‘converter’ target to release high fluxes of spallation neutrons which would then produce RIBs by fission in a secondary uranium carbide (UCx) target. An alternative windowless liquid mercury-jet ‘converter’ target to generate the neutrons has also been proposed for this Multi-MW target station. |
Task :
TASK 2
Code :
02-25-2009-0048
Inserted By :
Yacine Kadi
Inserted at :
03/09/2009
|
| |
|
Download ( 19262KB )
|
|
| |
|
|
| |
CODE EXPLANATION:
AA-BB-CCCC-DDDD
AA = TASK NUMBER
BB = TYPE OF THE DOCUMENT:
21 = JOURNAL ARTICLE
22 = ABSTRACT
23 = PROCEEDING
25 = INTERNAL TASK NOTE
27 = USEFUL DOCUMENTS
28 = CONSORTIUM AGREEMENT
29 = FINANCIAL DOCUMENTS
30 = CONTRACT
31 = ANNUAL REPORTS
32 = INTERIM ANNUAL REPORTS
33 = PLANNIG GUIDELINES
34 = FOUR MONTH REPORTS
CCCC = YEAR
DDDD = DOCUMENT NUMBER
|
|
|
|
Management Support Team
| Project Leader |
Site Developer
|