eurisol ds
Go to EURISOL DS Home
TASK 6 Heavy Ion Accelerator Design

 

Document Details






07/08/2009 - Internal Task note

Deliverable D4: Off line thermal and fluid dynamics test

Author(s) : K. Samec et al.

Early on in the EURISOL-DS study the converter target was identified as a major component on the critical path to demonstrating the overall concept of such a facility; without the target the entire project would not be feasible. The very harsh environment under which a target is to operate under irradiation is best summed by its governing parameters listed in Table 1.
Obtaining experimental proof of two independent target designs; one featuring a beam window, the other without, was therefore instrumental to proving a viable concept for the overall EURISOL facility. Considerable effort was expended on ensuring adequate testing of the designs for which all participants, in particular IPUL, devoted much time and effort.
Task :
TASK 2

Code :

02-25-2009-0042

Inserted By :
Yacine Kadi

Inserted at :
07/08/2009

  | Download ( 11860KB )  
 
 
 


CODE EXPLANATION: AA-BB-CCCC-DDDD

AA = TASK NUMBER

BB = TYPE OF THE DOCUMENT:

21 = JOURNAL ARTICLE
22 = ABSTRACT
23 = PROCEEDING
25 = INTERNAL TASK NOTE
27 = USEFUL DOCUMENTS
28 = CONSORTIUM AGREEMENT
29 = FINANCIAL DOCUMENTS
30 = CONTRACT
31 = ANNUAL REPORTS
32 = INTERIM  ANNUAL REPORTS
33 = PLANNIG GUIDELINES
34 = FOUR MONTH REPORTS

CCCC = YEAR

DDDD = DOCUMENT NUMBER



Management Support Team  |  Project Leader  |  Site Developer