TASK 6 Heavy Ion Accelerator Design
|
|
|
07/08/2009 - Internal Task note Deliverable D4: Off line thermal and fluid dynamics test
Author(s) : K. Samec et al.
Early on in the EURISOL-DS study the converter target was identified as a major component on the critical path to demonstrating the overall concept of such a facility; without the target the entire project would not be feasible. The very harsh environment under which a target is to operate under irradiation is best summed by its governing parameters listed in Table 1.
Obtaining experimental proof of two independent target designs; one featuring a beam window, the other without, was therefore instrumental to proving a viable concept for the overall EURISOL facility. Considerable effort was expended on ensuring adequate testing of the designs for which all participants, in particular IPUL, devoted much time and effort. |
Task :
TASK 2
Code :
02-25-2009-0042
Inserted By :
Yacine Kadi
Inserted at :
07/08/2009
|
| |
|
Download ( 11860KB )
|
|
| |
|
|
| |
CODE EXPLANATION:
AA-BB-CCCC-DDDD
AA = TASK NUMBER
BB = TYPE OF THE DOCUMENT:
21 = JOURNAL ARTICLE
22 = ABSTRACT
23 = PROCEEDING
25 = INTERNAL TASK NOTE
27 = USEFUL DOCUMENTS
28 = CONSORTIUM AGREEMENT
29 = FINANCIAL DOCUMENTS
30 = CONTRACT
31 = ANNUAL REPORTS
32 = INTERIM ANNUAL REPORTS
33 = PLANNIG GUIDELINES
34 = FOUR MONTH REPORTS
CCCC = YEAR
DDDD = DOCUMENT NUMBER
|
|
|
|
Management Support Team
| Project Leader |
Site Developer
|