eurisol ds
Go to EURISOL DS Home
TASK 6 Heavy Ion Accelerator Design

 

Document Details






07/10/2009 - Internal Task note

Conceptual Design Report for a Beta-Beam Facility

Author(s) : A. Bechtold, M. Benedikt, F. Borgnolutti, E. Bouquerel, L. Bozyk, A. Chancé, P. Delahaye, A. Fabich, S. Hancock, C. Hansen, E. Jensen, A. Kaellberg, M. Kirk, A. Lachaize, M. Lindroos, M. Magistris, A. Mueller, J. Payet, P. Puppel, P. Spiller, A. Tkatchenko, S. Trovati, V. Vlachoudis

The Beta-Beam project is a concept of large scale facility that aims at providing pure electronic neutrino and antrineutrino beams for the measurement of nu_e --> nu_µ oscillations, offering unprecedented sensitivity for detection of the Theta_13 mixing angle and CP violating phase. In the scenario presented in different publications [1-3], a Beta-Beam facility could be advantageously placed at CERN making use of the PS and SPS for accelerating the beta-decaying, neutrino-emitting beams to a Lorentz gamma of 100. Intense beams of 6He and 18Ne would be produced using the so-called “isotope-separation on line” ISOL method in a facility of the scale of EURISOL. The synergy between the two projects was pointed out in [4]. The task 12 of the EURISOL design study aimed at producing a conceptual design report for the accelerator chain of a EURISOL/CERN-baseline Beta-Beam facility. This document summarizes the achievements made during the time of the study and constitutes the final conceptual report of the beta-beam facility.

References
[1] B. Autin, M. Benedikt, M. Grieser, S. Hancock, H. Haseroth, A. Jansson, U. Köster, M. Lindroos, S. Russenschuck and F. Wenander, \"The acceleration and storage of radioactive ions for a neutrino factory\", CERN/PS 2002-078 (OP), Nufact Note 121, J. Phys. G 29 (2003) 1785-1796 and long internal CERN version, PS/OP/Note 2002-181.
[2] M.Mezzetto, \"Physics reach of the beta-beam\", J. Phys. G: Nucl. Part. Phys. 29 (2003) 1771–1776
[3] J. Bouchez, M. Lindroos and M. Mezzetto, 5th International Workshop on Neutrino Factories and Superbeams; NuFact 03. AIP Conference Proceedings, Volume 721, pp. 37-47 (2004).
[4] Letter of Intent: FP6 Design Study for a beta-beam facility , September, 2003
Task :
TASK 12

Code :

12-25-2009-0020

Inserted By :
Michael Benedikt

Inserted at :
07/10/2009

  | Download ( 1104KB )  
 
 
 


CODE EXPLANATION: AA-BB-CCCC-DDDD

AA = TASK NUMBER

BB = TYPE OF THE DOCUMENT:

21 = JOURNAL ARTICLE
22 = ABSTRACT
23 = PROCEEDING
25 = INTERNAL TASK NOTE
27 = USEFUL DOCUMENTS
28 = CONSORTIUM AGREEMENT
29 = FINANCIAL DOCUMENTS
30 = CONTRACT
31 = ANNUAL REPORTS
32 = INTERIM  ANNUAL REPORTS
33 = PLANNIG GUIDELINES
34 = FOUR MONTH REPORTS

CCCC = YEAR

DDDD = DOCUMENT NUMBER



Management Support Team  |  Project Leader  |  Site Developer