Publications: Journal article

CODE EXPLANATION:
AA-BB-CCCC-DDDD

AA = TASK NUMBER

BB = TYPE OF THE DOCUMENT:

21 = JOURNAL ARTICLE
22 = ABSTRACT
23 = PROCEEDING
25 = INTERNAL TASK NOTE
27 = USEFUL DOCUMENTS
28 = CONSORTIUM AGREEMENT
29 = FINANCIAL DOCUMENTS
30 = CONTRACT
31 = ANNUAL REPORTS
32 = INTERIM ANNUAL REPORTS
33 = PLANNIG GUIDELINES
34 = FOUR MONTH REPORTS

CCCC = YEAR

DDDD = DOCUMENT NUMBER

DRIVER BEAM-LED EURISOL TARGET DESIGN CONSTRAINTS

26/11/2008 -Task : TASK 3
Author(s) :E. Noah, R. Catherall, Y. Kadi, C. Kharoua, J. Lettry, T. Stora

EPAC2008 proceedings (jointly submitted with Task2) Overview of target design activities within Task#2 and Task#3
EURISOL 100 KW TARGET STATIONS OPERATION AND IMPLICATIONS FOR ITS PROTON DRIVER BEAM

26/11/2008 -Task : TASK 3
Author(s) :E. Noah, F. Gerigk, J. Lettry, M. Lindroos, T. Stora

Aspects related to the operation of the 100kW target station with an emphasis on the driver beam characteristics
Feasibility of High Power Refractory Metal-Foil Targets for EURISOL

14/03/2008 -Task : TASK 3
Author(s) :R. Wilfinger, J. Lettry

Manuscript on the feasibility and design of the 100kW refractory metal target
Publications from 1 to 3 of 3

      Copyright by Eurisol DS 2009