TASK 7 - Proton Accelerator Design

eurisol ds
The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac (with heavy ion capability for A/q ≤ 2 and possibly up to A/q = 3) as the main driver for EURISOL. This development will have possible application in all projects requiring high intensity proton beams.
TASK HOME
INTERNAL TASK NOTE
BEAM DYNAMICS STUDIES ON THE EURISOL DRIVER ACCELERATOR
29/10/2008 -Task : TASK 7
Author(s) :A. Facco, A. Balabin, R. Paparella, D. Zenere, INFN-Laboratori Nazionali di Legnaro, Padova, Italy; D. Berkovits, J. Rodnizki, SOREQ, Yavne, Israel; J. L. Biarrotte, S. Bousson, A. Ponton, IPN Orsay, France; R. Duperrier, D. Uriot, CEA/Saclay, France; V. Zvyagintsev, TRIUMF, Vancouver, Canada

Contributed paper at LINAC 2008 Conference, Victoria, Canada. The final design of the EURISOL Driver linac is described and beam dynamics simulation results are shown.
EURISOL DRIVER BASELINE DESIGN
10/05/2006 -Task : TASK 7
Author(s) :A. Facco on behalf of the EURISOL Task 7 group

Presentation of an upgraded linac scheme that allows, in addition to the 1 GeV proton beam, also acceleration of 3He up to 2 GeV and A/q=2 up to 250 MeV.
THE EURISOL PROGRAM
03/11/2005 -Task : TASK 7
Author(s) :A. Facco on behalf of the EURISOL Group

Invited presentation at the ICFA-HPSL2005 34rd ICFA Advanced Beam Dynamics Workshop on High Power Superconducting Ion, Proton, and Multi-Species Linacs, Naperville, Illinois, U.S.A. , May 23-24, 2005
DELIVERABLES

D1 Proton source and LEBT tests
No Milestones and expected results of this task Months due Months achieved Related documents
D1 /M1.1 Tests measurements 5
D1 /M1.2 Intermediate design 12
D1 /M1.3 Complete design 17 36 07-25-2008-0008

D2 RFQ and MEBT
No Milestones and expected results of this task Months due Months achieved Related documents
D2 /M2.1 Tests measurements 17
D2 /M2.2 Intermediate design 30
D2 /M2.3 Complete design 44 54 07-25-2009-0010

D3 Low and medium v/c linac
No Milestones and expected results of this task Months due Months achieved Related documents
D3 /M3.1 Preliminary layout and beam dynamics 9 9 ---0000
07-23-2006-0004
07-21-2006-0005
07-25-2005-0001
D3 /M3.2 Intermediate layout and beam dynamics 24 30 ---0000
---0000
07-25-2008-0009
D3 /M3.3 Layout and beam dynamics 50 54 07-25-2009-0018
07-25-2009-0017

D4 High v/c linac
No Milestones and expected results of this task Months due Months achieved Related documents
D4 /M4.1 Final layout and beam dynamic 50 54 07-25-2009-0011

D5 Ion injector
No Milestones and expected results of this task Months due Months achieved Related documents
D5 /M5.1 Layout and beam dynamics 44 54 07-25-2009-0012

D6 HEBT
No Milestones and expected results of this task Months due Months achieved Related documents
D6 /M6.1 Preliminary results 30 30 07-21-2007-0012
D6 /M6.2 Layout design 50 54 07-25-2009-0013

D7 Beam loss calculation
No Milestones and expected results of this task Months due Months achieved Related documents
D7 /M7.1 Preliminary results 24
D7 /M7.2 Final results 51 54 07-25-2009-0014