The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac (with heavy ion capability for A/q ≤ 2 and possibly up to A/q = 3) as the main driver for EURISOL. This development will have possible application in all projects requiring high intensity proton beams.
TASK HOME
INTERNAL TASK NOTE
BEAM DYNAMICS STUDIES ON THE EURISOL DRIVER ACCELERATOR
29/10/2008 -Task : TASK 7
29/10/2008 -Task : TASK 7
Author(s) :A. Facco, A. Balabin, R. Paparella, D. Zenere, INFN-Laboratori Nazionali di Legnaro, Padova, Italy; D. Berkovits, J. Rodnizki, SOREQ, Yavne, Israel; J. L. Biarrotte, S. Bousson, A. Ponton, IPN Orsay, France; R. Duperrier, D. Uriot, CEA/Saclay, France; V. Zvyagintsev, TRIUMF, Vancouver, Canada
Contributed paper at LINAC 2008 Conference, Victoria, Canada. The final design of the EURISOL Driver linac is described and beam dynamics simulation results are shown.
Contributed paper at LINAC 2008 Conference, Victoria, Canada. The final design of the EURISOL Driver linac is described and beam dynamics simulation results are shown.
|
Download
[ 07-25-2008-0009]
( 309KB )
EURISOL DRIVER BASELINE DESIGN
10/05/2006 -Task : TASK 7
10/05/2006 -Task : TASK 7
Author(s) :A. Facco on behalf of the EURISOL Task 7 group
Presentation of an upgraded linac scheme that allows, in addition to the 1 GeV proton beam, also acceleration of 3He up to 2 GeV and A/q=2 up to 250 MeV.
Presentation of an upgraded linac scheme that allows, in addition to the 1 GeV proton beam, also acceleration of 3He up to 2 GeV and A/q=2 up to 250 MeV.
|
Download
[ 07-25-2006-0002]
( 951KB )
THE EURISOL PROGRAM
03/11/2005 -Task : TASK 7
03/11/2005 -Task : TASK 7
Author(s) :A. Facco on behalf of the EURISOL Group
Invited presentation at the ICFA-HPSL2005 34rd ICFA Advanced Beam Dynamics Workshop on High Power Superconducting Ion, Proton, and Multi-Species Linacs, Naperville, Illinois, U.S.A. , May 23-24, 2005
Invited presentation at the ICFA-HPSL2005 34rd ICFA Advanced Beam Dynamics Workshop on High Power Superconducting Ion, Proton, and Multi-Species Linacs, Naperville, Illinois, U.S.A. , May 23-24, 2005
|
Download
[ 07-25-2005-0001]
( 2376KB )
DELIVERABLES
D1 Proton source and LEBT tests
No | Milestones and expected results of this task | Months due | Months achieved | Related documents |
D1 /M1.1 | Tests measurements | 5 | ||
D1 /M1.2 | Intermediate design | 12 | ||
D1 /M1.3 | Complete design | 17 | 36 | 07-25-2008-0008 |
D2 RFQ and MEBT
No | Milestones and expected results of this task | Months due | Months achieved | Related documents |
D2 /M2.1 | Tests measurements | 17 | ||
D2 /M2.2 | Intermediate design | 30 | ||
D2 /M2.3 | Complete design | 44 | 54 | 07-25-2009-0010 |
D3 Low and medium v/c linac
No | Milestones and expected results of this task | Months due | Months achieved | Related documents |
D3 /M3.1 | Preliminary layout and beam dynamics | 9 | 9 | ---0000 07-23-2006-0004 07-21-2006-0005 07-25-2005-0001 |
D3 /M3.2 | Intermediate layout and beam dynamics | 24 | 30 | ---0000 ---0000 07-25-2008-0009 |
D3 /M3.3 | Layout and beam dynamics | 50 | 54 | 07-25-2009-0018 07-25-2009-0017 |
D4 High v/c linac
No | Milestones and expected results of this task | Months due | Months achieved | Related documents |
D4 /M4.1 | Final layout and beam dynamic | 50 | 54 | 07-25-2009-0011 |
D5 Ion injector
No | Milestones and expected results of this task | Months due | Months achieved | Related documents |
D5 /M5.1 | Layout and beam dynamics | 44 | 54 | 07-25-2009-0012 |
D6 HEBT
No | Milestones and expected results of this task | Months due | Months achieved | Related documents |
D6 /M6.1 | Preliminary results | 30 | 30 | 07-21-2007-0012 |
D6 /M6.2 | Layout design | 50 | 54 | 07-25-2009-0013 |
D7 Beam loss calculation
No | Milestones and expected results of this task | Months due | Months achieved | Related documents |
D7 /M7.1 | Preliminary results | 24 | ||
D7 /M7.2 | Final results | 51 | 54 | 07-25-2009-0014 |